Search found 4 matches
- Mon Nov 21, 2022 11:46 pm
- Forum: Energy storage, batteries, energy tariffs
- Topic: G99 fast track commissioning
- Replies: 7
- Views: 1292
Re: G99 fast track commissioning
@ Nowty info Battery Solax X1 AC-3.6 inverter 10.6kW Master and one Slave with 5.2kW PV Array split East and West Solax x1 Boost 3.6kW system
- Sat Nov 19, 2022 8:47 pm
- Forum: Energy storage, batteries, energy tariffs
- Topic: G99 fast track commissioning
- Replies: 7
- Views: 1292
Re: G99 fast track commissioning
Application is required to be sent to DNO before Approval, Confirmation of Connection using G99 Fast Track, when confirmed approval is given, installation then Commissioning Forms are required with a set period of time 3 months. Take look at http://dcode.org.uk/ or DNO web site, for forms, could eve...
- Tue Oct 25, 2022 8:37 am
- Forum: Energy storage, batteries, energy tariffs
- Topic: Commissioning & Testing G98 and G100 via G99 Fast Track For Battery Storage
- Replies: 3
- Views: 830
Re: Commissioning & Testing G98 and G100 via G99 Fast Track For Battery Storage
I don’t think you can commission without the battery. I’m in the same position. Just got the wiring done by an electrician and waiting on battery to arrive. I think they usually give you about 6-9 months to commission right? Mine is next March and I applied in august. https://i.postimg.cc/v1KxD24d/...
- Mon Oct 24, 2022 7:30 am
- Forum: Energy storage, batteries, energy tariffs
- Topic: Commissioning & Testing G98 and G100 via G99 Fast Track For Battery Storage
- Replies: 3
- Views: 830
Commissioning & Testing G98 and G100 via G99 Fast Track For Battery Storage
Hi all, Been approved for G99 Fast Track for Battery Storage utilising Solax X1-AC-3.6kw inverter, and at the moment one Solax Triple Power LFP 5.8kw Master battery by SP Energy which is great (filled in the forms myself) just need a Competent Person Scheme Electrician for the installing and Signing...