Am the new owner since a week , of this old farmhouse in Bavaria
My intention was and still is to go offgrid in relation to electricity
Have to stay connected to sewage system, water mains and waste collection by law ( but may find a niche later) ....
The green German Minister announced that new PV installs will get 13.8 cent per kWh FiT (is about 6.5 c right now) from now on , but only for installs that completely feed that into the grid
So basically i would have nothing of it for me just an investment that i think is fair
I can still built my own island off grid supply and smile
just dreams for now
guess, i have to stay grid connected
Re: guess, i have to stay grid connected
Congratulations, loved Bavaira and Schlappseppel beer, enjoy the new home!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: guess, i have to stay grid connected
Hi Billi,
Great place with what looks to be heaps of potential. As you say you can have a system that earns for you and still have something of your own off grid to keep your soul happy too.
Moxi
Great place with what looks to be heaps of potential. As you say you can have a system that earns for you and still have something of your own off grid to keep your soul happy too.
Moxi
Re: guess, i have to stay grid connected
Thanks and exactly
just have to find the balance
In Ireland i just said , fecc it m no letterbox no invoices , no connection and that was costly fun
here now back in Germany i am again a learner that i was anyway as a kid
Have to carwl through those options anf finance ideas available , but i guess I could organize the install of the PV on my own and just get the official part then commissioned
just have to find the balance
In Ireland i just said , fecc it m no letterbox no invoices , no connection and that was costly fun
here now back in Germany i am again a learner that i was anyway as a kid
Have to carwl through those options anf finance ideas available , but i guess I could organize the install of the PV on my own and just get the official part then commissioned