Not seen it this high for a while !
Coal at 1.3Gw is high .
Nuclear seems low at 3.1Gw -have we an outage somewhere.
George

Image
1600w Vertical PV micro inverters
2000w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
User avatar
Stinsy
Posts: 2640
Joined: Wed Jun 02, 2021 1:09 pm

Re: Grid Demand

#2

Post by Stinsy »

We are still exporting to France so things must be even worse on the continent. Gas is running at 24GW and I believe we max out CCGT 28GW so things are tight that’s for sure!
Last edited by Stinsy on Wed Jan 10, 2024 11:07 am, edited 1 time in total.
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Countrypaul
Posts: 473
Joined: Sun Jul 18, 2021 11:50 am

Re: Grid Demand

#3

Post by Countrypaul »

ecogeorge wrote: Wed Jan 10, 2024 10:53 am Not seen it this high for a while !
Coal at 1.3Gw is high .
Nuclear seems low at 3.1Gw -have we an outage somewhere.
George

Image
Heysham and Hartlepool are both down - see the Nuclear decomissioning thread s/b all back by early Feb.
Moxi
Posts: 1781
Joined: Sun Oct 31, 2021 3:46 pm

Re: Grid Demand

#4

Post by Moxi »

Heysham stage 2 also has one reactor off (R7) for planned offload refuel.

Moxi
User avatar
nowty
Posts: 5140
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Grid Demand

#5

Post by nowty »

Not much coming in on the interconnectors and another 5GW or so to find at peak time around 5pm. :?

Coal is ramping up, there is another 2GW or so left on the CCGT, then there is another 2GW or so on the OCGT, we will lose the 2GW of solar, but we might gain roughly the same on the wind.

Then there is the pumped storage and the hydro which can be turned up a little, plus the diesel fields.

No Saving Session in sight so there must be confidence that we could draw on the interconnectors in case we lose another Nuke.

I look forward to Friday where it looks more squeaky bum time. :teapot:
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
ecogeorge
Posts: 337
Joined: Sun Oct 31, 2021 7:23 pm
Location: Gloucestershire

Re: Grid Demand

#6

Post by ecogeorge »

nowty wrote: Wed Jan 10, 2024 11:27 am I look forward to Friday where it looks more squeaky bum time. :teapot:
Note to self -Fill flask thursday night. :surrender:
George
1600w Vertical PV micro inverters
2000w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
ecogeorge
Posts: 337
Joined: Sun Oct 31, 2021 7:23 pm
Location: Gloucestershire

Re: Grid Demand

#7

Post by ecogeorge »

Never seen Gas this high :shock:
George
Image
1600w Vertical PV micro inverters
2000w almost horizontal/south
Aarrow Becton 7 Woodburner
Dream 3kw ASHP only connected to summer Pool.
Allotment heavy clay.
1.784kw Kirk Hill
0.875kw Derril Water
0.2kwWhitelaw Brae
1kw Harlow Hydro.
User avatar
nowty
Posts: 5140
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Grid Demand

#8

Post by nowty »

ecogeorge wrote: Thu Jan 11, 2024 10:30 am Never seen Gas this high :shock:
George
Image
We did have similar in early December, its pretty much at the max apart from another 1GW available on the OCGT.

And tomorrow there is about 3GW less wind at the peak time.
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
User avatar
nowty
Posts: 5140
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Grid Demand

#9

Post by nowty »

I looked at the data on Gridwatch and it was a CCGT record this morning at 26.226GW.

Slightly ahead of 26.109GW on 1st Dec 2023.
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
dan_b
Posts: 1861
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Grid Demand

#10

Post by dan_b »

I believe the UK has 28GW of combined cycle gas power station capacity, plus the open cycle ones as well for another 2GW or so is that right? So pretty close to everything being on?