My brother saved 77% and was awarded 176 points.
My mum saved 13% and was awarded 24 points.
I saved 100% (of nothing) and was awarded 8 points.
They seem to be gearing up for the next one now the results are all in, which would not surprise me if its on Wednesday evening, going off the wind generation forecast and cold temperatures. But will my export MPAN have been live long enough to make a valid baseline.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
All better than my award of 0 as it seems because I don't use power at all during the day it's not counted
16 250w Trina panels
Voltronic Axpert Max 8Kw hybrid inverter
3 x Chinese 125Ah (19Kwh total) batteries
To be done, more panels and a wind turbine
Off Grid 20 out of 24hrs
1.5 hrs and a live session, so might be a higher payout.
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. A DFS Service Requirement has been published for Wednesday 29/11/2023 between 17:00 and 18:30. Times in GMT The maximum demand reduction volume requested in this period is 550 MW. This will be Energy Tagged. For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service. Notification Issued at 15:10 hours on 28/11/2023. Issued by Natasa Dinic National Grid Electricity National Control Centre.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Good to hear, work in Edinburgh complete. I'll be home for that....sitting in the dark.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees