Lots more batteries to be connected to the grid in the next 12 months or so...
https://renews.biz/95159/edf-renewables ... ge-online/
EDF to bring 300MW of BESS online
EDF to bring 300MW of BESS online
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
-
- Posts: 214
- Joined: Fri Mar 11, 2022 7:48 pm
- Location: Lincolnshire
Re: EDF to bring 300MW of BESS online
Was I the only one to notice the probable error in this headline? 300MW? Surely it’s 300MWh? Power stations are rated by power output, which is a continuous measure. Storage should be correctly described - IMO of course ……
-
- Posts: 558
- Joined: Sun Jul 18, 2021 11:50 am
Re: EDF to bring 300MW of BESS online
I think this has been raised before, iirc one opinion is that since it will be a source of power then the power should be quoted. I tend o agree with you that the energy content shold be quoted, but quoting both would make things clearest as has been done wth the Iron-Air thread.Lincs Robert wrote: ↑Fri Aug 23, 2024 6:33 pm Was I the only one to notice the probable error in this headline? 300MW? Surely it’s 300MWh? Power stations are rated by power output, which is a continuous measure. Storage should be correctly described - IMO of course ……
-
- Posts: 214
- Joined: Fri Mar 11, 2022 7:48 pm
- Location: Lincolnshire
Re: EDF to bring 300MW of BESS online
+ 1. SortedCountrypaul wrote: ↑Fri Aug 23, 2024 7:05 pmI think this has been raised before, iirc one opinion is that since it will be a source of power then the power should be quoted. I tend o agree with you that the energy content shold be quoted, but quoting both would make things clearest as has been done wth the Iron-Air thread.Lincs Robert wrote: ↑Fri Aug 23, 2024 6:33 pm Was I the only one to notice the probable error in this headline? 300MW? Surely it’s 300MWh? Power stations are rated by power output, which is a continuous measure. Storage should be correctly described - IMO of course ……
Re: EDF to bring 300MW of BESS online
They make it hard to work out but its in MWp for 2 hours so its 313MWp and 626MWh capacity.
https://www.edf-re.uk/news-and-views/ed ... -projects/
https://www.edf-re.uk/news-and-views/ed ... -projects/
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
-
- Posts: 214
- Joined: Fri Mar 11, 2022 7:48 pm
- Location: Lincolnshire
Re: EDF to bring 300MW of BESS online
Thanks for that. They probably use the same “communication” team as the price cap mob?nowty wrote: ↑Sat Aug 24, 2024 10:44 am They make it hard to work out but its in MWp for 2 hours so its 313MWp and 626MWh capacity.
https://www.edf-re.uk/news-and-views/ed ... -projects/