Octopus saving sessions coming 1st Nov
Re: Octopus saving sessions coming 1st Nov
Are we calling it “done”
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: Octopus saving sessions coming 1st Nov
I wouldn't say its done for good but presently it doesn't look like its much good to a cohorts operating practises - whether the situation will change / improve in the near future is a tough question to answer.
I cant see Octopus giving up on an income stream - so I reckon they are looking at something that will match their needs with their customers in order to leverage benefits - just got to wait and see.
Moxi
I cant see Octopus giving up on an income stream - so I reckon they are looking at something that will match their needs with their customers in order to leverage benefits - just got to wait and see.
Moxi
Re: Octopus saving sessions coming 1st Nov
The chances get less and less as Solar generation encroaches into the peak period. There will still be DFS sessions but unless Octopus lowers its bids its not going to get any accepted. I thought we were done a couple of weeks back but we did get another one last week, so its not impossible, just unlikely.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Octopus saving sessions coming 1st Nov
I'm not going to bother rinsing then!
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: Octopus saving sessions coming 1st Nov
Another DFS today but Octopus were rejected at 15.4p / kWh, quite surprisingly bids of 15p / kWh or less were accepted. Its as if Octopus do not want to be part of it.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
-
- Posts: 2215
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Octopus saving sessions coming 1st Nov
perhaps they have recognised that setting it up and doing the number-crunching cost more than it brings in...
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Octopus saving sessions coming 1st Nov
Shame that it has moved to a model that doesn't suit Octopus, they lead the charge on this for so many years but seem to have had their bids declined more often than not this year!
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: Octopus saving sessions coming 1st Nov
Another DFS today but Octopus were rejected at 15p / kWh, bids of 14p / kWh or less were accepted.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Octopus saving sessions coming 1st Nov
Are we going to start seeing "free power hours" from Octopus in the coming weeks I wonder?
Already seeing negative wholesale prices during daytime due to high wind and solar, and very low gas - great for the pumped hydro and grid-scale batteries out there to get paid to charge up - when do we get a go at that too?!
As a reminder, National Grid are targeting 2025 for periods of 100% zero carbon generation when conditions allow - so well worth keeping an eye on the gas (and biomass) generation on the grid.
Already seeing negative wholesale prices during daytime due to high wind and solar, and very low gas - great for the pumped hydro and grid-scale batteries out there to get paid to charge up - when do we get a go at that too?!
As a reminder, National Grid are targeting 2025 for periods of 100% zero carbon generation when conditions allow - so well worth keeping an eye on the gas (and biomass) generation on the grid.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Octopus saving sessions coming 1st Nov
Another DFS today but Octopus were rejected at 15.8p / kWh, a few bids of 12p / kWh or less were accepted.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3