So, set my Solaredge batts to charge during cheap rate on Sunday evening. I also had the car set to charge on the 7kW charger, so didn't want the batts to empty themselves 'helping'.
Monday morning, the batts hadn't charged, but they also hadn't been discharging (until 5.30 when the charge period ended). During the day I set a 30min window to charge to see if they would, and the same again, no grid charging, but they also stopped supplying the house.
Looked on the Solaredge monitoring site and saw a new alert:
I've e-mailed the installers and asked them to look into it (no reply yet), but just wondering if anyone on here knows what this is, and if it's a trivial non-issue (once amended)?The system is operating in restricted import mode due to G.100 max import limitations.
To resolve the issue set the G.100 control back to Normal operation mode. You can use SolarEdge Monitoring platform or your SetApp mobile App.
I was thrown for a second by the G100 mention, but it does say for import (not export), and I assume this is a Solaredge issue, not anything to do with the DNO, after all, how would they be able to 'play' with my system.
Can't remember if this is the first time I've used the 7kW charger and battery charging, but probably is, so maybe that's relevant hitting a higher import figure? Or not? The inverter is 3.68kW, so including household demand (background leccy and A2A unit) perhaps 11kW to 11.5kW. House has an 80A fuse, so ~18kW?