Octopus saving sessions coming 1st Nov
Re: Octopus saving sessions coming 1st Nov
Just over a fiver for my last handicapped remote controlled session, paid for all my energy import that day.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Octopus saving sessions coming 1st Nov
£7.50 for me for all 4, didn’t do anything apart from click join..
Re: Octopus saving sessions coming 1st Nov
My average energy reduction in relative terms was 95%.
But my absolute energy saving was 0.31kWh.
Which earned me about a quid.
But hey I'd do it again!
But my absolute energy saving was 0.31kWh.
Which earned me about a quid.
But hey I'd do it again!
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Octopus saving sessions coming 1st Nov
£170 for all 4 sessions, makes November cost not too bad.
Just need GivEnergy to replace my wrongly supplied inverter so I can export faster and also get my baseline up between 5pm-7pm.
Still work to be done.
Plus I wish I had some ripple turbine income
Just need GivEnergy to replace my wrongly supplied inverter so I can export faster and also get my baseline up between 5pm-7pm.
Still work to be done.
Plus I wish I had some ripple turbine income
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
Re: Octopus saving sessions coming 1st Nov
Which inverter and what should they have supplied?
Re: Octopus saving sessions coming 1st Nov
I ordered a gen 2 and they supplied a gen 1. Thanks to your detective work on another thread.
All mine and the installer’s paperwork shows gen 2 but GivEnergy have said they are looking into it !!!!!!
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
Re: Octopus saving sessions coming 1st Nov
My memory is like a sieve!Yuff wrote: ↑Mon Dec 11, 2023 11:03 amI ordered a gen 2 and they supplied a gen 1. Thanks to your detective work on another thread.
All mine and the installer’s paperwork shows gen 2 but GivEnergy have said they are looking into it !!!!!!
Hope you get it resolved - let me know the outcome.
Re: Octopus saving sessions coming 1st Nov
Maybe a last minute test session today
Re: Octopus saving sessions coming 1st Nov
Yes, a short notice test session has been provisionally announced this morning, confirmation will come at midday.
From: Power System Manager - National Grid Electricity Control Centre
NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILITY SERVICE.
DFS Tests are scheduled for Tuesday 12/12/2023
This is an indication that DFS Service Requirements might be published 12/12/2023 at 12:00 for Providers being tested.
Tests will be System Tagged.
For full details see the ESO Data Portal at https://www.nationalgrideso.com/data-po ... ty-service.
Notification Issued at 08:00 hours on 12/12/2023.
Issued by Peter Chandler National Grid Electricity National Control Centre.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3