Is anyone having an issue getting schedules on Intelligent.
I had an email last week asking me to disconnect and re-connect to intelligent as Tesla have changed the way they allow octopus to interact with Tesla.
I have not done this yet as there have been lots of issues re-connecting by posters on the Tesla foru,
However today the app has stoped giving schedules and says it will produce a schedule when it’s plugged in. It is plugged in and it is controlling the charging but I don’t get a schedule showing
13:35 edit : schedule has appeared
IOG schedule issues
IOG schedule issues
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 3 170 kWh Batteries
Ripple 5.8 kW PV
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 3 170 kWh Batteries
Ripple 5.8 kW PV
Re: IOG schedule issues
I'm still getting schedules and I'm holding off doing the disconnect / reconnect and re-onboarding thing as long as I can because I fear some problems trying to re-connect. So until its broke, I not fixing it.
I've noticed the pull down screen on the app does not seem to force an update anymore, been that way for a few weeks, but if I shutdown the app and turn it on again it shows the update.
I've noticed the pull down screen on the app does not seem to force an update anymore, been that way for a few weeks, but if I shutdown the app and turn it on again it shows the update.
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
Re: IOG schedule issues
The pull down is working again.
Started working today.
I just toggled between devices and usage and it posted. No need to close the app down .
Started working today.
I just toggled between devices and usage and it posted. No need to close the app down .
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 3 170 kWh Batteries
Ripple 5.8 kW PV
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 3 170 kWh Batteries
Ripple 5.8 kW PV
Re: IOG schedule issues
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3