Is anyone having an issue getting schedules on Intelligent.
I had an email last week asking me to disconnect and re-connect to intelligent as Tesla have changed the way they allow octopus to interact with Tesla.
I have not done this yet as there have been lots of issues re-connecting by posters on the Tesla foru,
However today the app has stoped giving schedules and says it will produce a schedule when it’s plugged in. It is plugged in and it is controlling the charging but I don’t get a schedule showing :SOS:

13:35 edit : schedule has appeared
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 3 170 kWh Batteries
Ripple 5.8 kW PV
User avatar
nowty
Posts: 5139
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: IOG schedule issues

#2

Post by nowty »

I'm still getting schedules and I'm holding off doing the disconnect / reconnect and re-onboarding thing as long as I can because I fear some problems trying to re-connect. So until its broke, I not fixing it.

I've noticed the pull down screen on the app does not seem to force an update anymore, been that way for a few weeks, but if I shutdown the app and turn it on again it shows the update.
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
Yuff
Posts: 376
Joined: Sat Dec 31, 2022 1:18 pm
Location: East Midlands

Re: IOG schedule issues

#3

Post by Yuff »

The pull down is working again.
Started working today.
I just toggled between devices and usage and it posted. No need to close the app down .
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 3 170 kWh Batteries
Ripple 5.8 kW PV
User avatar
nowty
Posts: 5139
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: IOG schedule issues

#4

Post by nowty »

Yuff wrote: Mon Mar 25, 2024 4:02 pm The pull down is working again.
Started working today.
I just toggled between devices and usage and it posted. No need to close the app down .
So it is. :xl:

Its a 4am departure again. ;)
Image
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
Post Reply