HELP PLEASE
Posted: Mon Jul 15, 2024 5:18 pm
I have a FIT system that is a 3.68kw Solar Edge Inverter with 15 250W panels, and Power Optimisers this was a TFU and a serious mis-selling by the cowboys who installed the system (Solis inverter that exploded after a year so was replaced with the Solar edge system {I have NO Shading issues})) as I was sold a 4kw system with 280W panels
I am in Central Scotland, the 15 panels are on my roof facing about 245 degrees
FIT revenue 2023/24 April till April - I generated 2774 kW and earned just under £600 with just under £100 of that being the assumed 50% export con
I want to put some battery storage in and move onto a SEG with Octopus energy for the EXPORT part of my FIT contract (if I understand this correctly, I cannot be paid for exporting energy on a FIT and a SEG contract simultaneously BUT can change my FIT contract to a Generation only contract.
I am thinking about changing the inverter and removing the Power Optimisers (the Victron Multiplus-II 48V/5000VA inverter charger cannot interface with them as the SE inverter communicates with them using a propriety method)
My plan 'A' is a Victron Multiplus-II 48V/5000VA inverter charger and initially two Pylon US5000 batteries with a possible easy future upgrade plan 'B' to making that three
I am building a garage and plan 'C' is to load the roof with solar probably as many 550W panels as I can get on the roof (the roof with be sized with an overhand to maximise the area forthe panels) The roof will be facing about 130 degrees and should get the sun all day then I will add another Victron MultiPlus-II 48V 5000Va Inverter-Charger alongside my present PV one
At present, the SE inverter is mounted right underneath the roof under the panels.
I have a full height cellar, so I plan on moving the FIT PV inverter (the new to me Victron MultiPlus-II 48V 5000Va Inverter-Charger) on a board on one of the cellar walls, right underneath the cloakroom at the front of the house which has the main power inlet, the Consumer unit, the Smart Meter and the PV meter located there.
This will give me short cable runs for the Victron ET112 Energy Meter as well as the AC cabling The PV DC cables will need to be run from the present location at the top of the house (Chalet Bungalow to the location in the cellar BUT since there is an AC Cable going from the present SE FIT inverter to the FIT meter that run is easily followed.
One option is to just leave the SE FIT System alone and just wire in the Victron Multiplus-II 48V/5000VA inverter charger to the AC ring main (Grid and PV fed) then the DC to the Batteries
My parts list for just installing a battery storage system (not a totally complete one) is:
BATTERY STORAGE MAJOR PARTS LIST
ONE - Victron Multiplus-II 48V/5000VA inverter charger (a UL certified model)
ONE - Cerbo GX
ONE – GX Touch 70
ONE - GX Touch 70 Wall mount
ONE - MK3 – USB Interface (USB to VE Bus)
AS REQUIRED – CAT5e 3m patch cable I think I need two
TWO - Pylon US5000 4.8kw Batteries
ONE - Pylon US series cable pack
AS REQUIRED
DC Cabling AS REQUIRED
AC Cabling AS REQUIRED
48VOn/Off Battery switches (Blue Seas e-series) AS REQUIRED
Victron MEGA Fuses 100A and 200A 58V for 48V System AS REQUIRED
ONE - Lynx Distributor
ONE - AC On/Off switch
ONE – Energy Meter ET112 (single phase - max-100A)
ONE – Victron RS485 to USB cable/interface 5m (ASS030572050)
I was planning to use the present AC and DC switches IF I swap, upgrade the inverter
Obviously IF I do not touch the SE FIT system then I will need some switches
I can probably install 90% of this myself, The AC side will need to be connected and certified by an approved electrician
Octopus are happy with DIY installations and I suspect that adding batteries will not affect my MCS certification if we just leave the FIT system alone
Though going onto the roof is not my fave place to be :-( so that may need a 'professional to make the physical PV Panel modifications {removing the Power Optimisers} and reinstalling the netting to keep the birds out from nesting under the panels) so another good reason for leaving the present SE FIT system alone (sadly I cannot {legally} fit bigger panels) without binning my FIT contract so there may also be an option to UPGRADE the panels and dump my FIT contract totally
QUESTIONS
The Main one is do you think that my Present FIT earnings will go up if I change to the best possible contract with Octopus
Advice is sought here
I am totally fed up with the professional experts talking rubbish typically the Scottish Power 'technical expert' :-( said I could not add Batteries to my FIT system and when I) quoted OFGEM to him, he hung up on me.
So all comments and advice please
thanks
David
I am in Central Scotland, the 15 panels are on my roof facing about 245 degrees
FIT revenue 2023/24 April till April - I generated 2774 kW and earned just under £600 with just under £100 of that being the assumed 50% export con
I want to put some battery storage in and move onto a SEG with Octopus energy for the EXPORT part of my FIT contract (if I understand this correctly, I cannot be paid for exporting energy on a FIT and a SEG contract simultaneously BUT can change my FIT contract to a Generation only contract.
I am thinking about changing the inverter and removing the Power Optimisers (the Victron Multiplus-II 48V/5000VA inverter charger cannot interface with them as the SE inverter communicates with them using a propriety method)
My plan 'A' is a Victron Multiplus-II 48V/5000VA inverter charger and initially two Pylon US5000 batteries with a possible easy future upgrade plan 'B' to making that three
I am building a garage and plan 'C' is to load the roof with solar probably as many 550W panels as I can get on the roof (the roof with be sized with an overhand to maximise the area forthe panels) The roof will be facing about 130 degrees and should get the sun all day then I will add another Victron MultiPlus-II 48V 5000Va Inverter-Charger alongside my present PV one
At present, the SE inverter is mounted right underneath the roof under the panels.
I have a full height cellar, so I plan on moving the FIT PV inverter (the new to me Victron MultiPlus-II 48V 5000Va Inverter-Charger) on a board on one of the cellar walls, right underneath the cloakroom at the front of the house which has the main power inlet, the Consumer unit, the Smart Meter and the PV meter located there.
This will give me short cable runs for the Victron ET112 Energy Meter as well as the AC cabling The PV DC cables will need to be run from the present location at the top of the house (Chalet Bungalow to the location in the cellar BUT since there is an AC Cable going from the present SE FIT inverter to the FIT meter that run is easily followed.
One option is to just leave the SE FIT System alone and just wire in the Victron Multiplus-II 48V/5000VA inverter charger to the AC ring main (Grid and PV fed) then the DC to the Batteries
My parts list for just installing a battery storage system (not a totally complete one) is:
BATTERY STORAGE MAJOR PARTS LIST
ONE - Victron Multiplus-II 48V/5000VA inverter charger (a UL certified model)
ONE - Cerbo GX
ONE – GX Touch 70
ONE - GX Touch 70 Wall mount
ONE - MK3 – USB Interface (USB to VE Bus)
AS REQUIRED – CAT5e 3m patch cable I think I need two
TWO - Pylon US5000 4.8kw Batteries
ONE - Pylon US series cable pack
AS REQUIRED
DC Cabling AS REQUIRED
AC Cabling AS REQUIRED
48VOn/Off Battery switches (Blue Seas e-series) AS REQUIRED
Victron MEGA Fuses 100A and 200A 58V for 48V System AS REQUIRED
ONE - Lynx Distributor
ONE - AC On/Off switch
ONE – Energy Meter ET112 (single phase - max-100A)
ONE – Victron RS485 to USB cable/interface 5m (ASS030572050)
I was planning to use the present AC and DC switches IF I swap, upgrade the inverter
Obviously IF I do not touch the SE FIT system then I will need some switches
I can probably install 90% of this myself, The AC side will need to be connected and certified by an approved electrician
Octopus are happy with DIY installations and I suspect that adding batteries will not affect my MCS certification if we just leave the FIT system alone
Though going onto the roof is not my fave place to be :-( so that may need a 'professional to make the physical PV Panel modifications {removing the Power Optimisers} and reinstalling the netting to keep the birds out from nesting under the panels) so another good reason for leaving the present SE FIT system alone (sadly I cannot {legally} fit bigger panels) without binning my FIT contract so there may also be an option to UPGRADE the panels and dump my FIT contract totally
QUESTIONS
The Main one is do you think that my Present FIT earnings will go up if I change to the best possible contract with Octopus
Advice is sought here
I am totally fed up with the professional experts talking rubbish typically the Scottish Power 'technical expert' :-( said I could not add Batteries to my FIT system and when I) quoted OFGEM to him, he hung up on me.
So all comments and advice please
thanks