Posted: Tue Aug 20, 2024 9:53 am
by dan_b
Lots more batteries to be connected to the grid in the next 12 months or so...
https://renews.biz/95159/edf-renewables ... ge-online/
Re: EDF to bring 300MW of BESS online
Posted: Fri Aug 23, 2024 6:33 pm
by Lincs Robert
Was I the only one to notice the probable error in this headline? 300MW? Surely it’s 300MWh? Power stations are rated by power output, which is a continuous measure. Storage should be correctly described - IMO of course ……
Re: EDF to bring 300MW of BESS online
Posted: Fri Aug 23, 2024 7:05 pm
by Countrypaul
Lincs Robert wrote: ↑Fri Aug 23, 2024 6:33 pm
Was I the only one to notice the probable error in this headline? 300MW? Surely it’s 300MWh? Power stations are rated by power output, which is a continuous measure. Storage should be correctly described - IMO of course ……
I think this has been raised before, iirc one opinion is that since it will be a source of power then the power should be quoted. I tend o agree with you that the energy content shold be quoted, but quoting both would make things clearest as has been done wth the Iron-Air thread.
Re: EDF to bring 300MW of BESS online
Posted: Fri Aug 23, 2024 7:07 pm
by Lincs Robert
Countrypaul wrote: ↑Fri Aug 23, 2024 7:05 pm
Lincs Robert wrote: ↑Fri Aug 23, 2024 6:33 pm
Was I the only one to notice the probable error in this headline? 300MW? Surely it’s 300MWh? Power stations are rated by power output, which is a continuous measure. Storage should be correctly described - IMO of course ……
I think this has been raised before, iirc one opinion is that since it will be a source of power then the power should be quoted. I tend o agree with you that the energy content shold be quoted, but quoting both would make things clearest as has been done wth the Iron-Air thread.
+ 1. Sorted
Re: EDF to bring 300MW of BESS online
Posted: Sat Aug 24, 2024 10:44 am
by nowty
They make it hard to work out but its in MWp for 2 hours so its 313MWp and 626MWh capacity.
https://www.edf-re.uk/news-and-views/ed ... -projects/
Re: EDF to bring 300MW of BESS online
Posted: Sat Aug 24, 2024 10:46 am
by Lincs Robert
Thanks for that. They probably use the same “communication” team as the price cap mob?