Seems UK Govt still thinks it wants, and can achieve, 24GW of new nuclear capacity by 2050.
https://www.newcivilengineer.com/latest ... 1-10-2023/
Roadmap to 24GW of nukes
Roadmap to 24GW of nukes
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Roadmap to 24GW of nukes
Good article although I didn’t spot the section where they state that the energy will be too cheap to meter ? Oh and sizewell c on the bars by mid 2030 ? I thought it was a news article not a fairy tale . This all coming from the same bunch that gave us HS 1/2
Moxi
Moxi
Re: Roadmap to 24GW of nukes
I must admit that with the current bunch in Govt I was slightly surprised they didn't announce an end to the nuclear programme and a renewed second dash for gas instead?
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Roadmap to 24GW of nukes
I would be wondering what bad news was hidden behind this empty proclamation as seems to be the modus operandi of successive governments these days.
Moxi
Moxi
Re: Roadmap to 24GW of nukes
Moxi, Is that HS 1 & 2 or HS1/2?Moxi wrote: ↑Tue Oct 31, 2023 4:53 pm Good article although I didn’t spot the section where they state that the energy will be too cheap to meter ? Oh and sizewell c on the bars by mid 2030 ? I thought it was a news article not a fairy tale . This all coming from the same bunch that gave us HS 1/2
Moxi
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: Roadmap to 24GW of nukes
Probably similar to their 40 'new' 'hospitals' - look, is that flying pigs I see?dan_b wrote: ↑Tue Oct 31, 2023 3:46 pm Seems UK Govt still thinks it wants, and can achieve, 24GW of new nuclear capacity by 2050.
https://www.newcivilengineer.com/latest ... 1-10-2023/
Solar PV since July '22:
5.6kWp east/west facing
3.6kW Sunsynk hybrid inverter
2x 5.12kWh Sunsynk batteries
1.6kWp Hoymiles East/West facing PV on the man cave
Ripple DW 2kW
Ripple WB 200W
5.6kWp east/west facing
3.6kW Sunsynk hybrid inverter
2x 5.12kWh Sunsynk batteries
1.6kWp Hoymiles East/West facing PV on the man cave
Ripple DW 2kW
Ripple WB 200W