Would love to know more of the details- but this hopefully is a sign of things to come here in the UK by 2025 when National Grid says it will be able to run zero carbon when renewable generation conditions allow...

https://www.canarymedia.com/articles/cl ... s-in-a-row
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1343
Joined: Mon Jun 14, 2021 1:17 pm

Re: Portugal runs solely on renewables for 6 days

#2

Post by Mart »

Thanks Dan, really good news and a great piece to read. Looking forward to seeing the zero FF periods extending, and the annual consumption of FF's dropping. Hopefully the UK can do similar at some point this decade, with low carbon generation (including nuclear).

But it may be a job for 'Interconnector Man', as we need more, internal and external, to shift the wind gen at times.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
dan_b
Posts: 2361
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Portugal runs solely on renewables for 6 days

#3

Post by dan_b »

Yeah as mentioned National Grid's plan is to have periods of zero fossil generation during 2025 when conditions allow (sufficient wind and solar) - so not all that far away now really.

https://www.nationalgrideso.com/future- ... the%20time
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oliver90owner
Posts: 408
Joined: Wed Jun 16, 2021 3:48 pm

Re: Portugal runs solely on renewables for 6 days

#4

Post by Oliver90owner »

I expect that, at times, the UK could operate with zero gas generation for short periods. The problem is restarting the grid, after any serious black-outs, so spinning reserve is retained.

Last winter, the UK was exporting as much energy, to Europe, as possible (due to the invasion of Ukraine) but if conditions had been ‘normal’ the UK might have been able to import sufficient european energy to be able to make do without any of our spinning generation.

Another 6GW of wind generation would go a long way towards the goal of extended gas-free generation.🙂

Hinkley C will/should be starting mid 2026? How does that fit with closures of our old nuclear fleet? Net capacity gain or loss?
dan_b
Posts: 2361
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Portugal runs solely on renewables for 6 days

#5

Post by dan_b »

Current nuclear fleet sees all but one plant, removing approx. 4.5GW stopping generating by 2028, leaving just Sizewell B at 1.2GW.
If Hinkley C does come online in 2028, that would bring us back up to about 4.5GW - so basically parity there or thereabouts.

Sizewell C will add another 3.2GW, but no earlier than 2030.

Bradwell B - who knows what's happening with that now. Was supposed to be a 2GW of Chinese reactor tech online by 2030 but I'd say the chances of that happening are basically zero.