When plans for Dogger Bank D offshore wind farm were announced, there was much fanfare about how the energy generated would be used at a new energy site onshore which would include H2 production for "energy storage".
Seems instead they've decided to make landfall with a new 400kV substation connection to the national grid.
https://renews.biz/91635/dogger-bank-d- ... confirmed/
Bye bye H2 production
Bye bye H2 production
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Bye bye H2 production
Glad they've seen sense.
The H2 plan was never going to work.
The H2 plan was never going to work.
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)