HVDC Interconnectors

Any news worthy story. Good things to watch at the Cinema, Theatre, on TV or have you read a good book lately?
CrofterMannie
Posts: 101
Joined: Sun Jun 13, 2021 5:29 pm

Re: HVDC Interconnectors

#261

Post by CrofterMannie »

Adokforme wrote: Tue Aug 13, 2024 8:45 pm We can confirm preliminary work is already underway as being up at Inverness last week there were several teams of geothermal guys lodging in the Halls of residence along with ourselves and sharing kitchen facilities. I think they were a little surprised when I quizzed them about what they were engaged upon but happy to pass info on otherwise. Geothermal may have been a rather grand term, their expression, as they were mostly engaged on thrusting long canes into the ground establishing the depth of peat in areas being considered for Pylons. It was the Peterhead to Drax link although I'd rather assumed it was overground as opposed to HVDC. Have to confess it's surely a much better outcome, unless your a fisherman perhaps.
Great to see progress happening. The dark clouds of stiffled renewable progress are slowly beginning to recede. :xx:
Surely if you met them in Inverness they were working on the Beauly/Blackhillock/Peterhead overhead line.
8kw solar
ETA log boiler
5ha woodland
MG5EV
Adokforme
Posts: 616
Joined: Sun Sep 19, 2021 10:09 pm

Re: HVDC Interconnectors

#262

Post by Adokforme »

CrofterMannie wrote: Wed Aug 14, 2024 4:37 am
Adokforme wrote: Tue Aug 13, 2024 8:45 pm We can confirm preliminary work is already underway as being up at Inverness last week there were several teams of geothermal guys lodging in the Halls of residence along with ourselves and sharing kitchen facilities. I think they were a little surprised when I quizzed them about what they were engaged upon but happy to pass info on otherwise. Geothermal may have been a rather grand term, their expression, as they were mostly engaged on thrusting long canes into the ground establishing the depth of peat in areas being considered for Pylons. It was the Peterhead to Drax link although I'd rather assumed it was overground as opposed to HVDC. Have to confess it's surely a much better outcome, unless your a fisherman perhaps.
Great to see progress happening. The dark clouds of stiffled renewable progress are slowly beginning to recede. :xx:
Surely if you met them in Inverness they were working on the Beauly/Blackhillock/Peterhead overhead line.
Their words not mine. Maybe they've worked on both. They were from Edinburgh, but spend the week at Inverness, having weekends off. Eight hour days too. Didn't like to interrogate them further. :surrender:
dan_b
Posts: 2278
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#263

Post by dan_b »

Greenlink Interconnector update - all cabling is now complete and actual system testing to begin in the next few weeks.

This is a 0.5GW HVDC link between Wales and Ireland.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Adokforme
Posts: 616
Joined: Sun Sep 19, 2021 10:09 pm

Re: HVDC Interconnectors

#264

Post by Adokforme »

dan_b wrote: Sat Aug 24, 2024 11:29 am Greenlink Interconnector update - all cabling is now complete and actual system testing to begin in the next few weeks.

This is a 0.5GW HVDC link between Wales and Ireland.
Thanks @dan_b, another one added to the list.
dan_b
Posts: 2278
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#265

Post by dan_b »

Well well well.

Remember the assumed dead HVDC link from Iceland to the UK from years ago?
Just like in horror movies it appears it wasn't killed off entirely after all and is back for the 3rd act murder spree.

Well, it looks like plans have been upgraded for it to be a 1.8GW connection, seabed surveys have been completed and there is money behind it. Wonder if it'll get built after all? Stranger things have happened.

https://www.offshore-energy.biz/atlanti ... o-iceland/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oliver90owner
Posts: 397
Joined: Wed Jun 16, 2021 3:48 pm

Re: HVDC Interconnectors

#266

Post by Oliver90owner »

Wonder if it'll get built after all?

I hope so!
Mart
Posts: 1294
Joined: Mon Jun 14, 2021 1:17 pm

Re: HVDC Interconnectors

#267

Post by Mart »

Massively out of date now, but I recall the suggested CfD for the Iceland link was ~£85/MWh. Assuming that hasn't changed (CfD's are index-linked, so ~£120/MWh today), then it would be quite expensive v's PV and wind, but comparable to / cheaper than nuclear, and of course wouldn't be intermittent, so it may have a chance.

TBH, it was that £85/MWh I recall reading, v's the ~£20/MWh for the cheap Icelandic leccy, that left me doubtful of the Morocco to UK link, as it showed just how expensive the subsea cabling costs would be. But .... apologies for so much guessing ..... if the Morocco link is viable and affordable, then I'm left assuming that the HVDC cabling costs have fallen over time?


Both of these schemes excite me immensely, so I remain largely negative, just to avoid the disappointment - whilst quietly grinning and keeping my fingers and toes crossed.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
dan_b
Posts: 2278
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#268

Post by dan_b »

My reason for assuming it was dead was two-fold - there was considerable opposition in Iceland on environmental and cost grounds, and also what was at the time a seemingly ridiculously long sub-sea cable route.

Since it was first mooted, well there have been several rather long HVDC interconnectors built since then, which shows the distance is no longer the issue, so maybe resistance to the idea has diminished in Iceland too? Or maybe the money has just become more available?

s
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Adokforme
Posts: 616
Joined: Sun Sep 19, 2021 10:09 pm

Re: HVDC Interconnectors

#269

Post by Adokforme »

Or maybe the money has just become more available?
It may well be dan_b as I keep hearing that there are almost inexhaustible funds available for investment given a stable long term platform.
Have to confess that I'm not entirely convinced about the latter or indeed what parameters are used to assess it!
User avatar
Krill
Posts: 383
Joined: Fri Sep 02, 2022 4:38 pm

Re: HVDC Interconnectors

#270

Post by Krill »

Stable long term platform is investment speak for guaranteed minimum return to investors (and they will take the extra profit if available as well, thank you very much)
Solar PV: 6.4kW solar PV (Eurener MEPV 400W*16)
PV Inverter: Solis 6kW inverter
Batteries: 14.4kWh LiFePO4 batteries (Pylontech US5000*3)
Battery Inverter: LuxPowertek 3600 ACS*2 battery inverter
WBS: 8kW Hunter Avalon 6 Multifuel burner (wood only)
Post Reply