100% RE electricity this morning.
Re: 100% RE electricity this morning.
I think that would be called a synchronous condenser.
3.2kWp south facing solar array, MCS
Growatt SPH 3600 TL BL-UP 3.6kW hybrid inverter
Growatt SPH 5000 TL BL-UP 5kW hybrid inverter (in storage)
16.5kWh storage
2020 VW e-Golf, 35.8kWh
2022 Jaguar I-PACE, 90kWh
MyEnergi Zappi & Eddi
Growatt SPH 3600 TL BL-UP 3.6kW hybrid inverter
Growatt SPH 5000 TL BL-UP 5kW hybrid inverter (in storage)
16.5kWh storage
2020 VW e-Golf, 35.8kWh
2022 Jaguar I-PACE, 90kWh
MyEnergi Zappi & Eddi
Re: 100% RE electricity this morning.
Flywheels and synchronous compensators are not the same.
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
High-Inertia Solutions
Lister Drive Greener Grid Park is ABB’s first project to feature a high-inertia compensator configuration. This approach couples a 67 MVAr compensator with a 40-ton flywheel.
Combining a mid-size synchronous compensator with a flywheel has the important advantage of multiplying the available inertia by several times. At the same time, the losses may be lower compared to installing the whole inertia as a synchronous compensator. It is also a cost-effective way of using two mid-sized compensators together with the benefits of a high level of redundancy, increased inertia and greater controllability.
Together, the two units at the Lister Drive Greener Grid Park in Liverpool provide a total of more than 900 MW-seconds inertia. That means Lister Drive will provide about 1% of the UK’s projected minimum total inertia requirement for 2025. The compensators were commissioned in March 2023.
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
High-Inertia Solutions
Lister Drive Greener Grid Park is ABB’s first project to feature a high-inertia compensator configuration. This approach couples a 67 MVAr compensator with a 40-ton flywheel.
Combining a mid-size synchronous compensator with a flywheel has the important advantage of multiplying the available inertia by several times. At the same time, the losses may be lower compared to installing the whole inertia as a synchronous compensator. It is also a cost-effective way of using two mid-sized compensators together with the benefits of a high level of redundancy, increased inertia and greater controllability.
Together, the two units at the Lister Drive Greener Grid Park in Liverpool provide a total of more than 900 MW-seconds inertia. That means Lister Drive will provide about 1% of the UK’s projected minimum total inertia requirement for 2025. The compensators were commissioned in March 2023.
Re: 100% RE electricity this morning.
Well ..... you live and learn.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: 100% RE electricity this morning.
Here - 40 ton flywheels to provide synchronous compensation
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: 100% RE electricity this morning.
Dan, you need to check your synchronous compensation as you seem to be a bit out of phase.dan_b wrote: ↑Tue Aug 27, 2024 5:54 pm Here - 40 ton flywheels to provide synchronous compensation
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf