100% RE electricity this morning.
Re: 100% RE electricity this morning.
I think that would be called a synchronous condenser.
3.2kWp south facing solar array
3.6kWp north facing solar array
Growatt SPH 3600 TL BL-UP 3.6kW hybrid inverter
16.5kWh storage
2020 VW e-Golf, 35.8kWh
2022 Jaguar I-PACE, 90kWh
MyEnergi Zappi & Eddi
3.6kWp north facing solar array
Growatt SPH 3600 TL BL-UP 3.6kW hybrid inverter
16.5kWh storage
2020 VW e-Golf, 35.8kWh
2022 Jaguar I-PACE, 90kWh
MyEnergi Zappi & Eddi
Re: 100% RE electricity this morning.
Flywheels and synchronous compensators are not the same.
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
High-Inertia Solutions
Lister Drive Greener Grid Park is ABB’s first project to feature a high-inertia compensator configuration. This approach couples a 67 MVAr compensator with a 40-ton flywheel.
Combining a mid-size synchronous compensator with a flywheel has the important advantage of multiplying the available inertia by several times. At the same time, the losses may be lower compared to installing the whole inertia as a synchronous compensator. It is also a cost-effective way of using two mid-sized compensators together with the benefits of a high level of redundancy, increased inertia and greater controllability.
Together, the two units at the Lister Drive Greener Grid Park in Liverpool provide a total of more than 900 MW-seconds inertia. That means Lister Drive will provide about 1% of the UK’s projected minimum total inertia requirement for 2025. The compensators were commissioned in March 2023.
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
High-Inertia Solutions
Lister Drive Greener Grid Park is ABB’s first project to feature a high-inertia compensator configuration. This approach couples a 67 MVAr compensator with a 40-ton flywheel.
Combining a mid-size synchronous compensator with a flywheel has the important advantage of multiplying the available inertia by several times. At the same time, the losses may be lower compared to installing the whole inertia as a synchronous compensator. It is also a cost-effective way of using two mid-sized compensators together with the benefits of a high level of redundancy, increased inertia and greater controllability.
Together, the two units at the Lister Drive Greener Grid Park in Liverpool provide a total of more than 900 MW-seconds inertia. That means Lister Drive will provide about 1% of the UK’s projected minimum total inertia requirement for 2025. The compensators were commissioned in March 2023.
Re: 100% RE electricity this morning.
Well ..... you live and learn.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: 100% RE electricity this morning.
Here - 40 ton flywheels to provide synchronous compensation
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: 100% RE electricity this morning.
Dan, you need to check your synchronous compensation as you seem to be a bit out of phase.dan_b wrote: ↑Tue Aug 27, 2024 5:54 pm Here - 40 ton flywheels to provide synchronous compensation
https://www.statkraft.co.uk/newsroom/20 ... m-inertia/

3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf