Unbelievable that every Nuclear power station has at least one reactor offline for refuelling at the same time at this time of year. Could maybe do with some better planning! The reactors that are offline are also consuming nearly 100MW to keep them cool etc.Adokforme wrote: ↑Sat Nov 30, 2024 1:30 pm According to National Grid Live Nuclear output is 2.67 GW which is the lowest I've ever come across. The grid seems to be coping adequately all the same, it has me wondering just how low the figure needs to drop to before the "Must have a Nuclear baseline" argument has the wind taken out of it's sails!
HPC
Re: HPC - Nuclear output currently 2.67 GW
Living the dream in Austria.
Uk property 3.75kW PV linked to 3kW inverter.
Uk property 3.75kW PV linked to 3kW inverter.
Re: HPC - Nuclear output currently 2.67 GW
I think its actually perfect planning cos every current outage is planned refuelling and coming back early Dec.chris_n wrote: ↑Sat Nov 30, 2024 3:25 pmUnbelievable that every Nuclear power station has at least one reactor offline for refuelling at the same time at this time of year. Could maybe do with some better planning! The reactors that are offline are also consuming nearly 100MW to keep them cool etc.Adokforme wrote: ↑Sat Nov 30, 2024 1:30 pm According to National Grid Live Nuclear output is 2.67 GW which is the lowest I've ever come across. The grid seems to be coping adequately all the same, it has me wondering just how low the figure needs to drop to before the "Must have a Nuclear baseline" argument has the wind taken out of it's sails!
Its actually been even lower last year down to just over 2.0 GW mid Feb 2023.
https://camelot-forum.co.uk/phpBB3/view ... 594#p28594
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
-
- Posts: 981
- Joined: Tue Jun 01, 2021 12:35 pm
Re: HPC
Thats just the "bin" that contains the "slow explosion" of a controlled nuclear reaction the clever stuff is the primary and secondary coolant circuits that keep the energy transfer in equilibrium. Lose that capacity and all sorts of things go wrong very quickly, especially in a hydraulic coolant circuit as opposed to a compressive coolant circuit.
On the previous generations of reactor the size of the reactor was much smaller and was able to be manufactured by many more of the heavy engineering companies around the world as well as forgemasters in the UK - thats maybe one of the stronger arguments for the SMR's that the supply chain is much larger because the net operating parameters are more manageable with regards to temperature and pressure.
Always nice to see a big chunk of steel though, thats sixty years operational then another 60 to 120 years in situ while the activated portions of the steel vessel decay back to manageable levels to allow it to be removed and cut up / reprocessed / buried.
Moxi
On the previous generations of reactor the size of the reactor was much smaller and was able to be manufactured by many more of the heavy engineering companies around the world as well as forgemasters in the UK - thats maybe one of the stronger arguments for the SMR's that the supply chain is much larger because the net operating parameters are more manageable with regards to temperature and pressure.
Always nice to see a big chunk of steel though, thats sixty years operational then another 60 to 120 years in situ while the activated portions of the steel vessel decay back to manageable levels to allow it to be removed and cut up / reprocessed / buried.
Moxi
Re: HPC
Looks like Flamanville 3 will be connected to the grid tomorrow (20th December) as it continues to ramp up the power levels
https://www.france24.com/en/live-news/2 ... -on-stream