HVDC Interconnectors

Any news worthy story. Good things to watch at the Cinema, Theatre, on TV or have you read a good book lately?
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#281

Post by dan_b »

News!

Ofgen has just approved 5 planned new HVDC Interconnectors for development. 2 were not previously on my list.
None will be up and running before 2030 at the earliest, and compared to what I was aware of actually "only" represents an additional 1.4GW of overall planned HVDC connections, but shows the continued direction of travel.

Tarchon Link - 1.4GW connector from Essex to Germany.
Mares Connect - 750MW connector from Wales to Republic of Ireland
LirIC - 700MW connection from Scotland to Northern Ireland

and these two "Offshore Hybrid Asset" links - both will join to an offshore windfarm before supplying countries at both ends as well

LionLink - 1.8GW between Suffolk and the Netherlands
Nautilus Link - 1.4GW between the Isle of Grain and Belgium

This brings the UK to 19GW or so of interconnectors by 2032 or thereabouts.

For additional context, the first "OHA" - Kriegers Flack - was built a few years ago with an offshore wind farm in the Baltic sea which connects to both Denmark and Germany https://powerplants.vattenfall.com/kriegers-flak/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#282

Post by dan_b »

Update!
Neuconnect (the one to Germany) - they've completed "phase 1" of the cable laying - 56km of on-shore and near-shore sub-sea cabling have been laid in the UK. Construction will now pause over the winter. Still on target for commissioning in 2028
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Ken
Posts: 519
Joined: Mon Jul 26, 2021 10:07 am

Re: HVDC Interconnectors

#283

Post by Ken »

i welcome your updates -keep them coming.
Mart
Posts: 1329
Joined: Mon Jun 14, 2021 1:17 pm

Re: HVDC Interconnectors

#284

Post by Mart »

Yep, they always put on a smile on my face too.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: HVDC Interconnectors

#285

Post by dan_b »

Update - Greenlink (the new 0.5GW connection from Wales to Ireland) - has begun power transmission testing and if all goes well should enter full service in January 2025.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1329
Joined: Mon Jun 14, 2021 1:17 pm

Re: HVDC Interconnectors

#286

Post by Mart »

dan_b wrote: Mon Dec 02, 2024 11:11 am Update - Greenlink (the new 0.5GW connection from Wales to Ireland) - has begun power transmission testing and if all goes well should enter full service in January 2025.
Grrrrr, that's local energy, for local people. How very dare they! :fight:
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Moxi
Posts: 2327
Joined: Sun Oct 31, 2021 3:46 pm

Re: HVDC Interconnectors

#287

Post by Moxi »

Gives us chance to build some more turbines, some tidal and some pumped storage and make Wales an energy exporter Mart.

Would be nice to have Trydan Cymraeg as a national business.

Moxi
Mart
Posts: 1329
Joined: Mon Jun 14, 2021 1:17 pm

Re: HVDC Interconnectors

#288

Post by Mart »

Absolutely Moxi, Wales has a lot of potential, and also sheep that need shade ..... one day per year. :norfolk:
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Moxi
Posts: 2327
Joined: Sun Oct 31, 2021 3:46 pm

Re: HVDC Interconnectors

#289

Post by Moxi »

:lol:

Rest of the time those panels make great umbrellas for the dafadd

Moxi
Post Reply