Re: U.K. grid continues to decarbonise
Looking forward to gas being displaced from the no1 slot by wind in 2025 that will be a significant moment.
Thanks Dan, a welcome morning read
Moxi
Thanks Dan, a welcome morning read
Moxi
Re: U.K. grid continues to decarbonise
Same here. I had my fingers crossed for wind taking the lead in 2024, and Iamkate does have wind ahead of gas/FF's, but looks like the slightly poorer wind gen (than average) for the year left wind just behind. I assume, with more wind having come on line during 2024, that will operate throughout 2025, plus additional capacity that comes on line in 2025, wind will win ..... maybe, hopefully, this year. Be a lovely milestone.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: U.K. grid continues to decarbonise
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
-
- Posts: 408
- Joined: Wed Jun 16, 2021 3:48 pm
Re: U.K. grid continues to decarbonise
It won’t just be wind - it’ll also be helped by more solar, too. Even imported power, if it is convenient/more economical. Reduced UK power usage will also make a difference.
We can also assume that most exported generation will de derived from gas plants.
There are several factors in play, here. Not just the amount of wind generation.
Re: U.K. grid continues to decarbonise
Yep, lots of promise. I did write about increased solar, reducing gas demand, which helps wind take the lead ...... but I deleted it, as I'm painfully aware just how boring most of my posts are.Oliver90owner wrote: ↑Sat Jan 04, 2025 11:35 pm
It won’t just be wind - it’ll also be helped by more solar, too. Even imported power, if it is convenient/more economical. Reduced UK power usage will also make a difference.
We can also assume that most exported generation will de derived from gas plants.
There are several factors in play, here. Not just the amount of wind generation.
Probably jinx it now, but hard to see how wind doesn't take the win in 2025, which I'm so looking forward to, especially the mainstream media coverage.
I've already noticed on other forums, that the folk who used to deny AGW, RE potential, RE penetration levels etc etc, are already pivoting to commenting on days with high gas %age, and how reaching 100 net zero (95% clean accoreding to NG(ESO)) will be hard. I'm starting to think that the goalposts now have wheels permanently attached to make it easier/quicker to move them.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: U.K. grid continues to decarbonise
Don’t hold back Mart, I for one enjoy your posts and find them interesting and informative as well as sometimes challenging my base assumptions.
Moxi
Moxi
Re: U.K. grid continues to decarbonise
UK located gas power stations are important for national security (medium term)but the more export links we can get increases the financial viability of them, and also of wind power for those times of higher generation. Its a win win whilst still pushing for full decarbonisation.Oliver90owner wrote: ↑Sat Jan 04, 2025 11:35 pm
It won’t just be wind - it’ll also be helped by more solar, too. Even imported power, if it is convenient/more economical. Reduced UK power usage will also make a difference.
We can also assume that most exported generation will de derived from gas plants.
There are several factors in play, here. Not just the amount of wind generation.
+1
Solar PV: 6.4kW solar PV (Eurener MEPV 400W*16)
PV Inverter: Solis 6kW inverter
Batteries: 14.4kWh LiFePO4 batteries (Pylontech US5000*3)
Battery Inverter: LuxPowertek 3600 ACS*2
EV: Hyundai Kona 65kWh
WBS: 8kW Hunter Avalon 6 Multifuel burner (wood only)
PV Inverter: Solis 6kW inverter
Batteries: 14.4kWh LiFePO4 batteries (Pylontech US5000*3)
Battery Inverter: LuxPowertek 3600 ACS*2
EV: Hyundai Kona 65kWh
WBS: 8kW Hunter Avalon 6 Multifuel burner (wood only)
Re: U.K. grid continues to decarbonise
Useful/interesting to look at what wind farms are expected to come online in 2025 - in terms of MWp but location and whether there are grid constraints for them to contend with - found a few:
Offshore
Moray West (880MW) - construction complete, to be fully commissioned early 2025 - grid connection in Blckhillock, Aberdeenshire
Dogger Bank A (1.2GW) - already generating but still being completed - finish 2nd half of 2025 - grid connection in East Riding
Neart Na Gaoithe (450MW) - also already generating but still being completed - finish 2nd half of 2025 - grid connection in Dunbar, East Lothian
Onshore
Benbrack (67MW) - construction complete, commissioning beginning 2025 - located in Galloway
Camster 2 - (36MW) - extension to existing site - mid-2025 - located in Caithness
Enoch Hill (69MW) - completion expected June-2025 - located in East Ayrshire
it seems that the big new offshore wind farm in Scotland called Seagreen has been hugely grid constrained since it was commissioned - it's only running at a load factor of about 14%.
Offshore
Moray West (880MW) - construction complete, to be fully commissioned early 2025 - grid connection in Blckhillock, Aberdeenshire
Dogger Bank A (1.2GW) - already generating but still being completed - finish 2nd half of 2025 - grid connection in East Riding
Neart Na Gaoithe (450MW) - also already generating but still being completed - finish 2nd half of 2025 - grid connection in Dunbar, East Lothian
Onshore
Benbrack (67MW) - construction complete, commissioning beginning 2025 - located in Galloway
Camster 2 - (36MW) - extension to existing site - mid-2025 - located in Caithness
Enoch Hill (69MW) - completion expected June-2025 - located in East Ayrshire
it seems that the big new offshore wind farm in Scotland called Seagreen has been hugely grid constrained since it was commissioned - it's only running at a load factor of about 14%.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
-
- Posts: 2092
- Joined: Wed Jun 02, 2021 6:10 pm
Re: U.K. grid continues to decarbonise
oh dear, Bootstrap No 2 from Peterhead is still (at least) 5 years away... https://www.ssen-transmission.co.uk/pro ... 5499557323 and https://www.easterngreenlink2.co.uk/
No 1 seems to have about the same dates too!
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!