Kent to Suffolk grid link - very few details
https://renews.biz/99693/national-grid- ... -sea-link/
Sealink grid upgrade
Sealink grid upgrade
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
-
- Posts: 2215
- Joined: Wed Jun 02, 2021 6:10 pm
Re: Sealink grid upgrade
so is this about making more effective use of what comes in from France? (or exporting N Sea wind generation via the interconnectors?) Maybe both...The proposed 138km connection, from Pegwell Bay in Kent to a point on the Suffolk coast between Aldeburgh and Thorpeness, will run mostly offshore.
Around 122km of the cables will be located under the sea with underground cables then linking to converter stations so electricity can be transported to where it is needed in East Anglia, Kent, and the rest of the country.
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Re: Sealink grid upgrade
I guess it’s both.
Apparently a 2GW HVDC transmission line