As Dan is off on a jaunt, I though I would post this bit of good news up.
The EGL2 HVDC link between Peterhead and Drax has now got all the relevant planning consents in place.
https://www.newcivilengineer.com/latest ... 5-08-2023/
The EGL2 HVDC link between Peterhead and Drax has now got all the relevant planning consents in place.
https://www.newcivilengineer.com/latest ... 5-08-2023/
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: HVDC Interconnectors
VIkingLink update - first full end to end cable test has been completed, running the whole network up to to 735,000 volts, 1.4 times its operational voltage of 525,000 volts.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HVDC Interconnectors
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: HVDC Interconnectors
BBC Radio article on the Viking Link Interconnector - well worth a listen
https://www.bbc.co.uk/sounds/play/w3ct4n00
https://www.bbc.co.uk/sounds/play/w3ct4n00
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HVDC Interconnectors
Hi Dan, just to say that I noticed OFGEM's list of interconnectors seems to have changed/updated. It now seems more reflective of the info you've been consistently reporting. I'm sure it previously had ~15GW+ by 2025(ish), now it's ~15GW- by 2030.
Existing and future interconnector projects
Existing and future interconnector projects
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: HVDC Interconnectors
Thanks Mart - yes the figures have been amended to reflect the longer timelines from various delayed and cancelled projects.
Might do a quick bit of HVDC update research, see if anything else is happening
Might do a quick bit of HVDC update research, see if anything else is happening
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HVDC Interconnectors
Small update
The FABLink Interconnector which is going from France to Exeter and no longer via Alderney - they have been granted planning approval for the revised converter station plans - this was required to reduce visual impact on the local environment and the net result was also a reduction in transmission capacity from 1400 to 1250MW.
Not likely to be complete before 2030.
The FABLink Interconnector which is going from France to Exeter and no longer via Alderney - they have been granted planning approval for the revised converter station plans - this was required to reduce visual impact on the local environment and the net result was also a reduction in transmission capacity from 1400 to 1250MW.
Not likely to be complete before 2030.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HVDC Interconnectors
Update
Viking Link today (11th December) starts final commissioning tests with power flows in both directions starting at 10% of max capacity and steadily increasing during the test period. Aim is to be running at full capacity commercially by 29th December...
Whoever runs the Grid Energy Numbers website might want to add Denmark to the countries on the interconnectors segment pretty soon...
Viking Link today (11th December) starts final commissioning tests with power flows in both directions starting at 10% of max capacity and steadily increasing during the test period. Aim is to be running at full capacity commercially by 29th December...
Whoever runs the Grid Energy Numbers website might want to add Denmark to the countries on the interconnectors segment pretty soon...
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HVDC Interconnectors
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
42kWh LFPO4 storage
7kW ASHP
200ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: HVDC Interconnectors
Goes very close to my house and I'm in negotiations with them regards access rights during construction.Joeboy wrote: ↑Wed Dec 13, 2023 8:51 pm Has this been covered? EGL1.
https://www.theguardian.com/business/20 ... lectricity
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 135kWh Rolls batteries, 52kWh Growatt storage GBLI 6532, 66kWh Pylontech US3000C, 43kWh DIY, Sofar ME3000's, Brosley wood burner and 250lt DHW