Noticed on Grid Energy Numbers that UK Nuke has quietly crept back up to over 5GW (5.3GW today to be precise).

So had a quick look on the EDF Nuclear Power Plant Status and it seems like all but one nuclear generator sites is up and running - Hartlepool A is the only unit not generating and that's expected to be back online on 10th December. Just in time for the cold snap! Useful.

https://www.edfenergy.com/energy/power- ... y-statuses
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Swwils
Posts: 563
Joined: Sat Feb 26, 2022 12:58 pm

Re: UK Nuclear Fleet

#2

Post by Swwils »

Not getting any younger though are they!
dan_b
Posts: 2361
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: UK Nuclear Fleet

#3

Post by dan_b »

Indeed not, and their replacements keep getting more delayed and more expensive!
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
nowty
Posts: 5924
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: UK Nuclear Fleet

#4

Post by nowty »

I think the government has asked whether the remaining plants can be kept open for longer.

https://www.theguardian.com/environment ... 0in%202035.

EDF said on Wednesday that it would review whether there was a case to keep open the Hartlepool nuclear power plant in County Durham and Heysham 1 on the north-west coast of England near Lancaster. Both plants had been scheduled to close in March 2024.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
dan_b
Posts: 2361
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: UK Nuclear Fleet

#5

Post by dan_b »

I guess it depends on how much longer it'll take to get Hinkley C and then Sizewell C up and generating. The answer to which is "blinkin' ages yet".
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Moxi
Posts: 2365
Joined: Sun Oct 31, 2021 3:46 pm

Re: UK Nuclear Fleet

#6

Post by Moxi »

I wonder what EDF are leveraging against the government for consideration of keeping the two plants running longer?

That said ultimately the decision isnt EDF's or Governments but H M Nuclear Inspectorate, the two stations are sister sites so they share the same designs and components and their moderators are quite fissured these days according to what I am told, the main issue for them though is the fact that their pod boilers had to be welded in many years ago due to crevice corrosion and the pod boilers are leaking more and more and are too complex in form to fix internally via remote methods being helical spiral in nature rather than more traditional formats.

https://www.onr.org.uk/documents/licenc ... ndbook.pdf

The link takes you to the ONR pages and the licensing requirements for all sites, the issue of convincing the regulator that the facility remains compliant really starts around section 26 for an aging station and the subsequent sections get harder and therefore more expensive to prove. Statutory outages normally take the reactor offline for 9 to 18months so any extension will only come after a period off the bars anyway.

I have worked on a number of outages for Magnox units where we worked for many months before being told of the decision to retire the unit as costs were pushing them to a loss.

Feels like the government doing what it does best - grasping at straws and displaying its ignorance.

Moxi
Moxi
Posts: 2365
Joined: Sun Oct 31, 2021 3:46 pm

Re: UK Nuclear Fleet

#7

Post by Moxi »

More bad news for France, us and Europe in general as EDF have again pushed back restart dates for some of their aging fleet.

https://www.msn.com/en-gb/news/world/ed ... 6c302b0710

Lets hope the wind keeps blowing favourably and we can export to Europe to help.

Moxi
dan_b
Posts: 2361
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: UK Nuclear Fleet

#8

Post by dan_b »

Its not all bad news, there's this last sentence

"However, the restart of the 1.3 GW Cattenom 1 reactor was moved forward by two weeks to Feb. 12."
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
dan_b
Posts: 2361
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: UK Nuclear Fleet

#9

Post by dan_b »

Which unfortunately also then coincides with a statutory outage at Sizewell B!
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Moxi
Posts: 2365
Joined: Sun Oct 31, 2021 3:46 pm

Re: UK Nuclear Fleet

#10

Post by Moxi »

Dan, having worked in the industry for many a year I would not count of the "two weeks early" statement until it actually happens :lol:

But fingers crossed eh........