Latest snippet for Hinkley C and the existing aging energy infrastructure.
Moxi
Latest snippet for Hinkley C and the existing aging energy infrastructure.
Moxi
Re: HPC
https://www.msn.com/en-gb/news/world/fr ... 758b&ei=13
I wonder if the ongoing issues at Hinkley C are part of the reasoning for the increase although interestingly EDF still believe they can build 6 more reactors for 22.46 Billion Euro's per pair still significantly less that the Hinckley C current costs, obviously the COVID element of the bill and the first of type safety case can be decoupled for the French reactors but I would be surprised if that alone could address the difference in projected costs?
Flamanville unit 3 should be being fuelled up at the moment and hot commission mid 2024, original price 3.1 billion, current estimated out turn costs 13.5 to 19.4 billion depending on what you read and where, so maybe the 22.46 billion is realistic ?
Moxi
I wonder if the ongoing issues at Hinkley C are part of the reasoning for the increase although interestingly EDF still believe they can build 6 more reactors for 22.46 Billion Euro's per pair still significantly less that the Hinckley C current costs, obviously the COVID element of the bill and the first of type safety case can be decoupled for the French reactors but I would be surprised if that alone could address the difference in projected costs?
Flamanville unit 3 should be being fuelled up at the moment and hot commission mid 2024, original price 3.1 billion, current estimated out turn costs 13.5 to 19.4 billion depending on what you read and where, so maybe the 22.46 billion is realistic ?
Moxi
Re: HPC
Interestingly, Olkiluoto 3 has just been taken offline for planned maintenance/refuelling for the first time since being commissioned a year ago
https://www.nucnet.org/news/one-year-af ... e-3-5-2024
As you say, Flamanville 3 is due to start fuel loading this month.
https://www.nucnet.org/news/one-year-af ... e-3-5-2024
As you say, Flamanville 3 is due to start fuel loading this month.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HPC
Meanwhile at the Sizewell C site, they've bought some more land - feels like this is going to happen now regardless
https://www.nucnet.org/news/sizewell-c- ... n-3-2-2024
https://www.nucnet.org/news/sizewell-c- ... n-3-2-2024
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HPC
And over at Hinkley Point C there's this bit of news.
Is this good? Spoil from HPC to be used for the foundations of a new battery factory?
https://www.theconstructionindex.co.uk/ ... atas-plant
Is this good? Spoil from HPC to be used for the foundations of a new battery factory?
https://www.theconstructionindex.co.uk/ ... atas-plant
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HPC
And at Flamanville, they have regulatory approval to start fuel loading at the new EPR there.
https://www.dw.com/en/france-set-to-com ... a-68690778
https://www.dw.com/en/france-set-to-com ... a-68690778
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HPC
Interview with lead Civil Engineer at Sizewell C
https://www.theengineer.co.uk/content/i ... sizewell-c
https://www.theengineer.co.uk/content/i ... sizewell-c
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: HPC
Sizewell C "heavily de-risked" to attract pension funds...
https://realassets.ipe.com/analysis/jul ... 23.article
https://realassets.ipe.com/analysis/jul ... 23.article
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work