Possibly a bonkers idea - cavity wall insulation

cojmh
Posts: 187
Joined: Wed Mar 16, 2022 8:11 pm
Location: West Midlands

Re: Possibly a bonkers idea - cavity wall insulation

#51

Post by cojmh »

Well, the fun and games are due to start this week.

It took a long time to get everything sorted with the structural engineer which kind of brought the whole project to halt for nearly 6 weeks. But we have got there now and both the structural engineer and building control are happy with the plan.

We have investigated all of the foundations along the whole gable wall end and 50% of it already had sufficient foundations for the move. So we only needed to extend half of the foundations thankfully. All of the foundations are now project out between 300mm and 380mm from the existing wall (we are only moving the wall by a maximum of 40-50mm).

The supporting steels will arrive on Monday and the brick work will start coming down on Wednesday. The gable wall end will be taken down and rebuilt in 7 sections and the builder is hoping it will take 2 weeks to do.

the butterflies will arrive soon I am sure!
cojmh
Posts: 187
Joined: Wed Mar 16, 2022 8:11 pm
Location: West Midlands

Re: Possibly a bonkers idea - cavity wall insulation

#52

Post by cojmh »

Thought I would post an update.

Just read my last message with the comment "The gable wall end will be taken down and rebuilt in 7 sections and the builder is hoping it will take 2 weeks to do." and well .... it took a bit longer!!

We are currently taking down section 7 ready to be rebuilt next week ..... so I am hoping by next Friday it will mean that the scaffolding can come down and we will be switching back to ground level (or below - Drain pipes and gas mains etc.). In the end it will have taken closer to 5 weeks!

Found quite a few gremlins under the surface - so it has been a worthwhile process to deal with those.

I will sort out all my photos and upload a few if people are interested?
User avatar
Fintray
Posts: 1477
Joined: Mon May 31, 2021 6:37 pm
Location: Aberdeenshire

Re: Possibly a bonkers idea - cavity wall insulation

#53

Post by Fintray »

cojmh wrote: Thu Oct 17, 2024 3:45 pm Thought I would post an update.

Just read my last message with the comment "The gable wall end will be taken down and rebuilt in 7 sections and the builder is hoping it will take 2 weeks to do." and well .... it took a bit longer!!

We are currently taking down section 7 ready to be rebuilt next week ..... so I am hoping by next Friday it will mean that the scaffolding can come down and we will be switching back to ground level (or below - Drain pipes and gas mains etc.). In the end it will have taken closer to 5 weeks!

Found quite a few gremlins under the surface - so it has been a worthwhile process to deal with those.

I will sort out all my photos and upload a few if people are interested?
I'm interested in seeing the photos.
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf