Any fuses on the lines? How stressed are you about a misidentified cable or an accidental short during installation?
Insulating Timber Garage
Re: Insulating Timber Garage
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
3x 380W JA Solar panels (1.14kWp)
6x 2.4kWh Pylontech batteries (14.4kWh)
LuxPower inverter/charger
(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
Re: Insulating Timber Garage
There is no doubt that connecting up the balancer is nerve wracking, lots of tape over every exposed bit is your friend.
An instructional video here,
An instructional video here,

18.7kW PV > 111MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Re: Insulating Timber Garage
Inline fuses will be at the battery end, have ferruled each cable as I made each one and when the pcb connector is terminated to be 100 percent each cable is correct I will bell each one out as a precaution before I crimp/terminate onto the battery pack( still boxed)
Still waiting on self adhesive pcb stand off to arrive and another 16 inline fuses, plus still waiting on G99 approval…
Just a wee bit at a time due to other projects
Still waiting on self adhesive pcb stand off to arrive and another 16 inline fuses, plus still waiting on G99 approval…
Just a wee bit at a time due to other projects