tempory shower
Posted: Mon Feb 20, 2023 10:48 pm
Hi folks ............ have dhw at gravity pressure from gas indirect cylinder.
All cold taps are cold mains pressure.
Bath only
need a temp shower before major refit to include thermal store and wood boiler......
FED UP WITH SLOW BATHS ...........
Want a shower (over bath) option whilst renovating.
A shower pump (taking cold/hot at atmospheric pressure) seems easiest but is lots plumbing - hot/cold vented supply.
I have cold (mains) hot (vented) - any clever cheap ideas ????
A cold only feed electric shower is too much work for temp supply..
George
All cold taps are cold mains pressure.
Bath only
need a temp shower before major refit to include thermal store and wood boiler......
FED UP WITH SLOW BATHS ...........
Want a shower (over bath) option whilst renovating.
A shower pump (taking cold/hot at atmospheric pressure) seems easiest but is lots plumbing - hot/cold vented supply.
I have cold (mains) hot (vented) - any clever cheap ideas ????
A cold only feed electric shower is too much work for temp supply..
George