Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
User avatar
nowty
Posts: 5783
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1421

Post by nowty »

Joeboy wrote: Mon Jul 04, 2022 7:36 pm
nowty wrote: Mon Jul 04, 2022 6:33 pm
Joeboy wrote: Mon Jul 04, 2022 6:23 pm Anyone else get 'the offer' today?
Yes, but I’m already at 120%. :evil:
Lie accordingly. :twisted:
I already had, with Kirk Hill I'm officially only 120% but I'm actually round 180%. ;)

My fathers @ 200%, but he's officially only at 77%, I think I'll sign him up for a few more. :twisted:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1422

Post by Joeboy »

nowty wrote: Mon Jul 04, 2022 9:33 pm
Joeboy wrote: Mon Jul 04, 2022 7:36 pm
nowty wrote: Mon Jul 04, 2022 6:33 pm

Yes, but I’m already at 120%. :evil:
Lie accordingly. :twisted:
I already had, with Kirk Hill I'm officially only 120% but I'm actually round 180%. ;)

My fathers @ 200%, but he's officially only at 77%, I think I'll sign him up for a few more. :twisted:
You are well sorted then. I'll have to line up a whopper for Proj 3.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
TCA
Posts: 48
Joined: Fri Jan 14, 2022 7:11 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1423

Post by TCA »

Joeboy wrote: Mon Jul 04, 2022 6:23 pm Anyone else get 'the offer' today?
Are they trying to flog more kW in order to reduce the bank funding?
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1424

Post by Mr Gus »

I cannot access my emails currently & am keen to know what's happening, logged into my ripple account & would have thought any messages would duplicate there, ..nope.
What is happening?
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
John_S
Posts: 377
Joined: Wed Jun 02, 2021 10:03 am
Location: West London

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1425

Post by John_S »

Ripple are inviting us to join the waiting list to buy WT1 shares. Looks as if they must have people wanting to sell. Includes warning about not exceeding 120%.

Nothing about the 2 year moratorium on sales in the offer document.
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1426

Post by Joeboy »

TCA wrote: Mon Jul 04, 2022 11:00 pm
Joeboy wrote: Mon Jul 04, 2022 6:23 pm Anyone else get 'the offer' today?
Are they trying to flog more kW in order to reduce the bank funding?
Thinking this too.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 2024
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1427

Post by AE-NMidlands »

I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1428

Post by Joeboy »

AE-NMidlands wrote: Tue Jul 05, 2022 8:07 am I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
You should be in there AE as it's current GF investors. I received a mail to my Hotmail account not via Ripple dashboard?
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 2024
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1429

Post by AE-NMidlands »

Joeboy wrote: Tue Jul 05, 2022 8:20 am
AE-NMidlands wrote: Tue Jul 05, 2022 8:07 am I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
You should be in there AE as it's current GF investors. I received a mail to my Hotmail account not via Ripple dashboard?
I had got it, found it when I went digging. Thanks Joe.
I missed it amongst loads off other stuff - and coincidentally the confirmation of my reservation in phase 3 the same day.
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 8094
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#1430

Post by Joeboy »

AE-NMidlands wrote: Tue Jul 05, 2022 8:36 am
Joeboy wrote: Tue Jul 05, 2022 8:20 am
AE-NMidlands wrote: Tue Jul 05, 2022 8:07 am I haven't seen that either. Maybe something to do with whether we are currently signed up or in others stages, or already at 120%?
I would like to up my phase 2 investment, as I suspect that might be the sweet spot: onshore, well-established technology, likely to give a better return than phase 1.. How well is part 3 going to turn out? The risks look a lot greater to me.
A
You should be in there AE as it's current GF investors. I received a mail to my Hotmail account not via Ripple dashboard?
I had got it, found it when I went digging. Thanks Joe.
I missed it amongst loads off other stuff - and coincidentally the confirmation of my reservation in phase 3 the same day.
A
Good to hear! Starting track work this month then at KH? Should hopefully hear about Project 3 soon?
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Post Reply