Dogger Bank construction progress

Wind turbines
Post Reply
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Dogger Bank construction progress

#1

Post by dan_b »

Trench digging for the on-shore HVDC transmission cables almost complete

https://doggerbank.com/construction/duc ... -teesside/
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
nowty
Posts: 5885
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Dogger Bank construction progress

#2

Post by nowty »

The turbines for that windfarm are 14MW monsters with an extra 1MW of Power Boost technology taking it up to 15MW. :o
https://sofiawindfarm.com/media/pd3iqrp ... 222-dd.pdf

I managed to find out the details of the Power Boost function. :mrgreen:


Q: The turbine can be adjusted to produce 15 MW with Power Boost. Can you explain how?

A: The Power Boost function is a wind turbine control feature that increases (boosts) power based on real-time monitoring of the site-specific conditions. For turbines equipped with Power Boost, this functionality is always active. However, if for example the wind speed reaches storm levels, or the turbulence level exceeds a certain limit, Power Boost is deactivated, and the turbine returns to normal power. What we have seen in our fleet analysis is that the Power Boost feature is active more than 98% of the available time, and thus ready to produce up to 15 MW power for this turbine.



It also set a record last year and maintained an average output of 14.95 MW over a 24 hour period. :twisted:
https://balticwind.eu/siemens-gamesa-tu ... ld-record/
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
dan_b
Posts: 2329
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Dogger Bank construction progress

#3

Post by dan_b »

So basically power boost turns it up to 11
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
nowty
Posts: 5885
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Dogger Bank construction progress

#4

Post by nowty »

dan_b wrote: Wed Apr 12, 2023 4:01 pm So basically power boost turns it up to 11
For the benefit of any young people who never saw Spinal Tap. ;)
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Post Reply