Shetland wind farm and connector up and running.

Wind turbines
Post Reply
User avatar
nowty
Posts: 6015
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Shetland wind farm and connector up and running.

#2

Post by nowty »

18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 30MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
Ken
Posts: 544
Joined: Mon Jul 26, 2021 10:07 am

Re: Shetland wind farm and connector up and running.

#3

Post by Ken »

Does anybody know where we can monitor production of Shetland Wind but more particularly export to the mainland.
Post Reply