Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#251

Post by nowty »

Joeboy wrote: Thu Oct 28, 2021 9:13 pm
Tinbum wrote: Thu Oct 28, 2021 8:59 pm Concrete is about 2.5T per m3. Trucks vary from about 6 to 7 cube.
X60 trucks, what a heat that'll be! 1 kilotonne+, Jings!
Also, in the AGM they also said the structure is over 100 tonnes.

Its not just a tall building sitting there either, can you imagine the wind forces on that 100m rotor all pushing on that hub 70 metres up, principle of moments and all that. :shock:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
AE-NMidlands
Posts: 2036
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Wind Turbine, fancy it?

#252

Post by AE-NMidlands »

nowty wrote: Thu Oct 28, 2021 9:47 pm Its not just a tall building sitting there either, can you imagine the wind forces on that 100m rotor all pushing on that hub 70 metres up, principle of moments and all that. :shock:
When I saw the pics it did occur to me that just relying on gravity seemed a bit simplistic. It may be a very big lump of concrete, but that's all it is!
I would have thought that backing it up with 4 diagonal drilled holes out and down into the ground and big rebar cemented in to lock it down would have been much stronger (and might have allowed much less material overall.)
I know we are insured against failures of various types, and we could go after the designers if it tips, but I bet our insurance doesn't cover lost earnings!
A
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#253

Post by nowty »

SWMBO has a work colleague, who apart from being an anti-vaxxer, was complaining to her about all these wind turbines which don't generate anything and are built with so much steel and concrete that they are making the climate change even worse. :evil:

We know from previous discussions on t’other forum that Solar PV becomes carbon neutral after about 3 years, but I had not heard how long a wind turbine takes to become carbon neutral. During the AGM it was quoted that an industry standard figure is around 6 months which quite surprised me as that’s 6 times faster than PV. I have this morning looked at some info online and 6 months does seem to be in the ball park, especially with a large 2MW+ size.

So I decided to do a back of fag packet calculation to see if that’s credible with the Ripple Wind Turbine 1.

We have heard from AGM that the structure is over 100 tonnes and of course its mainly in the steel tower so we will use 100 tonnes of steel. We also heard 60 concrete deliveries and we worked out its around 1000 tonnes. I did a rough estimate of volume from the photo using the people as a guide for dimensions and I came to a similar conclusion so we will take a figure of 1000 tonnes of reinforced concrete.

I found info on carbon per tonne of reinforced concrete, and of steel.

80kg of CO2 per tonne reinforced concrete (so incudes the steel in the foundation).
1.85 tonnes of CO2 per tonne of steel.

1000 tonnes of reinforced concrete = 80 tonnes CO2
100 tonnes of steel = 185 tonnes CO2

So that’s 265 tonnes of CO2, but then there’s the road, leccy cable, lots of FF vehicles, shipping of the turbine etc. I don’t know how much to add so I’m just going to say total carbon in the range of 300 to 400 tonnes of CO2. Lets take the pessimistic value of 400 tonnes of CO2.

Now the forecast annual generation (P75) is 6681 MWh for the 2.5MW wind turbine.

Now what grid CO2 value should we use, I think that generally wind displaces gas powered generation, so the best gas power stations are over 400g per kWh so let’s be generous to gas and say its 400g / kWh.

So that’s 0.4 tonnes of CO2 per MWh, therefore 6681 x 0.4 = 2672 tonnes of CO2 saved per year.
400 / 2672 = 0.15, so that’s only a little under 2 months, i.e. 12 months x 0.15 = 1.8 months

I guess you could use the grid average of about 233g (2020 figures from Bulb), in that case it would be 1557 tonnes of CO2 saved.
400 / 1557 = 0.26, so that’s still only just over 3 months. NOTE - Ripples own figures use grid average of 255g and 1707 tonnes of CO2 saved.

And even if we used an even more pessimistic value of 500 tonnes of carbon for the whole build / installation.
500 / 1557 = 0.32, so that’s still just under 4 months.

Maybe you could argue if its really windy then the really big windfarms get curtailed and I believe this one does not, therefore you should use a lower generation figure because your displacing other wind farm generation, because the grid is crap and you need a minimum amount of gas generation to keep a minimum amount of asynchronous generation. So maybe lets knock off 30% of the generation and use 1090 tonnes of CO2 saved.

500 / 1090 = 0.46, so thats nearly 5.5 months.

Anyhow, unless I've missed a decimal point or something it looks pretty darn good. Even by being ultra pessimistic I cannot get the calculation to be above 6 months. And as most wind is in winter, if it manages to go operational by the end of this year, it could be carbon neutral by the time of the members Easter picnic. :mrgreen:

Must remember to pack some truly zero carbon Budweiser from the South Wales Brewery powered by its bigger 3.5MW sister at Magnor. Cos that ones already been running since Dec 2020, so its guaranteed to have passed its carbon neutrality date.:beer:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
spread-tee
Posts: 609
Joined: Mon May 31, 2021 7:16 pm
Location: ville of spiky things

Re: Part ownership of a Wind Turbine, fancy it?

#254

Post by spread-tee »

Nice fag packet Nowty, I've had similar chats with anti-winders here and there and it doesn't matter how eloquently you make an argument or back up the numbers with published info mostly they just WILL not believe anything presented to them.

I sometimes think a kick in the balleaux is more effective :shock:

Desp
Blah blah blah
Bugtownboy
Posts: 971
Joined: Tue Jun 01, 2021 12:35 pm

Re: Part ownership of a Wind Turbine, fancy it?

#255

Post by Bugtownboy »

Is that a silent X, Desp ? ;)
User avatar
Joeboy
Posts: 8113
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Wind Turbine, fancy it?

#256

Post by Joeboy »

Do we think the pour is complete? It's only 9 mins per on a first light to last light basis and even that's being kind. Jings, heavy logistics.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#257

Post by nowty »

Joeboy wrote: Fri Oct 29, 2021 5:24 pm Do we think the pour is complete? It's only 9 mins per on a first light to last light basis and even that's being kind. Jings, heavy logistics.
I guess you could get several, maybe 4 or 5 in convey up the track and as one pours, the others park in the hard standing area for the big crane. Then each one leaves after pouring until they have all done. Then another 4 or 5 waiting at the bottom come up and do it all over again.

And repeat about a dozen times over the day but as you say its quite a demanding timescale unless you can have several pouring simultaneously which may be possible and might be the only way to achieve the timescales in a single day.

The same contactor did the larger 3.5MW turbine in Magnor South Wales last year which would have taken even more concrete, but that was on flat ground near the coast and not up a steep mountain track.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
spread-tee
Posts: 609
Joined: Mon May 31, 2021 7:16 pm
Location: ville of spiky things

Re: Part ownership of a Wind Turbine, fancy it?

#258

Post by spread-tee »

Would you want to pour that much crete in one go? that's a lot of heat to dissipate.

Desp
Blah blah blah
User avatar
Joeboy
Posts: 8113
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Wind Turbine, fancy it?

#259

Post by Joeboy »

spread-tee wrote: Fri Oct 29, 2021 10:55 pm Would you want to pour that much crete in one go? that's a lot of heat to dissipate.

Desp
Its what they do, no seams. I WANT PHOTOS!!! :)

Who's closest?
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5797
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#260

Post by nowty »

Joeboy wrote: Fri Oct 29, 2021 10:57 pm
spread-tee wrote: Fri Oct 29, 2021 10:55 pm Would you want to pour that much crete in one go? that's a lot of heat to dissipate.

Desp
Its what they do, no seams. I WANT PHOTOS!!! :)

Who's closest?
I spoke with bxman earlier and in his online chat with Sarah yesterday it seems that the usual photographer is on holiday. :evil:
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3