Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
AE-NMidlands
Posts: 1959
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2511

Post by AE-NMidlands »

Joeboy wrote: Mon Apr 10, 2023 9:35 pm 113% CF 19.00hrs. :o
It's a not so bad...
Image
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2512

Post by Joeboy »

AE-NMidlands wrote: Mon Apr 10, 2023 9:58 pm
Joeboy wrote: Mon Apr 10, 2023 9:35 pm 113% CF 19.00hrs. :o
It's a not so bad...
Image
71.5% CF yesterday. Just over £12 made. That will head towards Project 3 😁.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 1959
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2513

Post by AE-NMidlands »

Joeboy wrote: Tue Apr 11, 2023 8:23 am 71.5% CF yesterday. Just over £12 made. That will head towards Project 3 😁.
Yes, and maybe another couple of good days before it goes quiet again... Lovely.
(January was a belting month though, 14 almost consecutive days above 50%)
A
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2514

Post by Joeboy »

AE-NMidlands wrote: Tue Apr 11, 2023 8:26 am
Joeboy wrote: Tue Apr 11, 2023 8:23 am 71.5% CF yesterday. Just over £12 made. That will head towards Project 3 😁.
Yes, and maybe another couple of good days before it goes quiet again... Lovely.
(January was a belting month though, 14 almost consecutive days above 50%)
A
It was indeed. If it repeats next Jan it will throw off over £220 in a single month. :shock:
GF is going to go a long way towards paying for P3.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2515

Post by Joeboy »

After writing what we'd make towards P3 from GF in Jan 24 I thought i should have a look and see how it could fully play out. Set my guesstimate figure at 12p per kWh from KH and it being operational from 1st March 24.

I ran the sum with
50% of GF return
100% of Solar FIT
100% of Hydro-turbine return
100% of KH return outputting from 1st March 24

I managed to cover a whopping 67% of the cost of a 3kW VPV in the Southern sector paying into it from June 23 to May 24 with our current in play RE (shares not included).

That is a hell of a deal. Son & daughter have also signed up for the VPV. Son already has 3kW of KH. Family RE at multiple locations, pretty awesome! :D
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2516

Post by nowty »

I ran my numbers and one year of FIT + one year of GF on the old lower rate will 100% cover 4.4kW of VPV in P3. :shock:

It would be rude not to. :twisted:
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 7801
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2517

Post by Joeboy »

Output isn't matching the weather at site, not even close. :roll:

Edit 0800hrs- OK it picked up a bit. :lol:
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2518

Post by nowty »

Crazy stats,

The last two days of GF generation will likely pay for the whole of my April import. :shock:

Todays GF generation alone will likely pay for the whole of my import from May to mid Sept. :twisted:

That does not include the standing charge though :evil:, I need another 3 similar days for that. :lol:
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
nowty
Posts: 5579
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2519

Post by nowty »

SafetyThird wrote: Wed Apr 05, 2023 11:15 am
nowty wrote: Wed Apr 05, 2023 10:43 am Unless your at the very top of the waiting list, you will be waiting a very long time, probably forever, so I would go with the Solar farm. The released shares are only from a few individuals who could not keep up their monthly payments so had to withdraw from the CoOp.

If however you get lucky and are offered another slug of KH before the Solar farm offer opens, I'd be inclined to max out on KH as its cheaper, faster payback and is also part way through construction with no obvious problems.
Thanks Nowty, have joined the waiting list on the off chance I get to add a bit but otherwise I'll be on the solar farm.
A bit of info from ripple answering a question about the KH waiting list,

Q- I’ve joined the waiting list to buy more KH which would impact what I could invest in R3, if I called the office would they be able to give me a likelihood of getting more KH (ie am I number 7 or number 10004) ?

A- Everyone who has been successful will be contacted this week and I'll send an email to everyone who has been unsuccessful this round. If you have been unsuccessful it is very unlikely there'll be more shares soon so P3 is your best bet...and P3 is very close now.
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Fintray
Posts: 1444
Joined: Mon May 31, 2021 6:37 pm
Location: Aberdeenshire

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#2520

Post by Fintray »

Damn!
Thank you for requesting additional shares in Kirk Hill. You are now part of the live wait list as and when additional shares become available.

We can confirm that the small number of available Kirk Hill shares have now been allocated to members at the top of this wait list. There remains over 1,300 members on the wait list. A total of 155,000 kWh have now been allocated to 81 members. We do not anticipate many more shares being available in the near future. You will remain on the waiting list but if you are looking to increase your ownership soon, you are now much better placed joining Project 3.
:(
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Post Reply