Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
Moxi
Posts: 2063
Joined: Sun Oct 31, 2021 3:46 pm

Re: Part ownership of a Wind Turbine, fancy it?

#281

Post by Moxi »

Post removed
Last edited by Moxi on Sun Mar 31, 2024 8:50 pm, edited 1 time in total.
User avatar
nowty
Posts: 5571
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#282

Post by nowty »

Moxi wrote: Thu Nov 11, 2021 9:04 pm Hi Nowty,

Better make that 2001 people signed up :D

Yes apparently start date is January 2022 for WT2 so as you say launched off the back of start of generation for WT 1 and the media attention that will create.

Interesting times

Moxi
So that's 14 members from here on my secret list for WT2, one more than my secret list for WT1 or are you already a member of WT1 ?
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Moxi
Posts: 2063
Joined: Sun Oct 31, 2021 3:46 pm

Re: Part ownership of a Wind Turbine, fancy it?

#283

Post by Moxi »

Post removed
Last edited by Moxi on Sun Mar 31, 2024 8:51 pm, edited 1 time in total.
User avatar
Joeboy
Posts: 7778
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Wind Turbine, fancy it?

#284

Post by Joeboy »

A BBC spot. Particularly liked the look of the clean can on 'ours' and scale of the mast compared to van on the other turbines at 15.00

https://www.bbc.co.uk/iplayer/episode/m ... 1#t=12m36s
Last edited by Joeboy on Fri Nov 12, 2021 9:48 am, edited 1 time in total.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 1950
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Wind Turbine, fancy it?

#285

Post by AE-NMidlands »

I have just had my invitation to do the Trustpilot review...
https://uk.trustpilot.com/review/www.ri ... com?page=3
It's not surprising that members who are looking forward to it starting generating soon are optimistic! After all the build seems to be going OK and nothing seems to have gone badly wrong yet (as far as we, the public are aware!)
A
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Stinsy
Posts: 2640
Joined: Wed Jun 02, 2021 1:09 pm

Re: Part ownership of a Wind Turbine, fancy it?

#286

Post by Stinsy »

AE-NMidlands wrote: Fri Nov 12, 2021 9:43 am I have just had my invitation to do the Trustpilot review...
https://uk.trustpilot.com/review/www.ri ... com?page=3
It's not surprising that members who are looking forward to it starting generating soon are optimistic! After all the build seems to be going OK and nothing seems to have gone badly wrong yet (as far as we, the public are aware!)
A
This David Jennings chap likes a quick response to his queries!


Image
12x 340W JA Solar panels (4.08kWp)
3x 380W JA Solar panels (1.14kWp)
5x 2.4kWh Pylontech batteries (12kWh)
LuxPower inverter/charger

(Artist formally known as ******, well it should be obvious enough to those for whom such things are important.)
User avatar
nowty
Posts: 5571
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#287

Post by nowty »

Joeboy wrote: Fri Nov 12, 2021 9:42 am A BBC spot. Particularly liked the look of the clean can on 'ours' and scale of the mast compared to van on the other turbines at 15.00

https://www.bbc.co.uk/iplayer/episode/m ... 1#t=12m36s
I saw the video but missed that parked van. From what I can find out about the existing wind farm, its 76 x 3MW Siemens turbines and was completed in 2017. Their foundation concrete pouring took a continuous 12hrs. Rotor diameter is the about the same at 100m so our turbine will look almost the same in size. https://group.vattenfall.com/uk/what-we ... -y-cymoedd

And interestingly the wind farm has a battery consisting of 500 x BMW i3 battery packs. https://group.vattenfall.com/uk/what-we ... attery-pyc

Image
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
AE-NMidlands
Posts: 1950
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Wind Turbine, fancy it?

#288

Post by AE-NMidlands »

Email just come in:
We are thrilled to let you know your 2.5MW Vensys turbine will arrive on site next week and the process of assembling the major parts will begin this coming Monday! This is a huge milestone for you, our 907 Graig Fatha members, without whom none of this would be possible.

The erection of the turbine is anticipated to take 3 days, culminating with the blades being lifted into place on Wednesday, if the weather holds up.

We'll be there on site every day next week to bring you lots of exciting photos as it happens. The quickest way for you to access these will be to visit your members' dashboard where we hope to share the progress on a daily basis.
Members' dashboard
We are working with all the relevant parties to ensure your turbine is energised as quickly as possible, so you can begin to receive your own source of green electricity and see your bill savings. The grid company expects to be ready for us to export power in late February.

We look forward to bringing you all the exciting news from site next week!
No comment needed!
A
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
Joeboy
Posts: 7778
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Wind Turbine, fancy it?

#289

Post by Joeboy »

:) :clap::clap::clap:

Hopefully they can bring late February forward.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5571
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Wind Turbine, fancy it?

#290

Post by nowty »

Joeboy wrote: Wed Nov 17, 2021 9:49 am :) :clap::clap::clap:

Hopefully they can bring late February forward.
Looks a tad windy next week, this week would have been better, but everything still looks on schedule !
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3