Moxi wrote: ↑Sun Dec 31, 2023 2:46 pm
Maybe some gusts or change in turbine direction caused a temporary feathering of the blades to reduce stress on blades and bearings ?
Moxi
Probably, it looks pretty extreme out there.
Looking like finishing the month +10% on top of baseline for Dec.
18.7kW PV > 111MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Moxi wrote: ↑Sun Dec 31, 2023 2:46 pm
Maybe some gusts or change in turbine direction caused a temporary feathering of the blades to reduce stress on blades and bearings ?
Moxi
Probably, it looks pretty extreme out there.
Looking like finishing the month +10% on top of baseline for Dec.
GF is caning KH tonight.
We are 3MWh grid bought this month. A lot of EV miles, a bit of Octoverse, plus,... absolutely no gas. Not possible without yon Welsh turbine. Might even be 2% into the VB too, only just. Kind of amazing .
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
The Jetstream has been a little further south this month and GF has even beaten KH's capacity factor baseline by about 3%. If KH had been running I reckon it would have underperformed its baseline this month.
Thats one of the advantages of having both.
18.7kW PV > 111MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 34MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
nowty wrote: ↑Sun Dec 31, 2023 6:31 pm
The Jetstream has been a little further south this month and GF has even beaten KH's capacity factor baseline by about 3%. If KH had been running I reckon it would have underperformed its baseline this month.
Thats one of the advantages of having both.
What's that we spy around the corner?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
nowty wrote: ↑Mon Jan 01, 2024 12:33 am
Now 2024, half past midnight and the cash is coming in faster than 1p per minute.
Happy New Year to you all!
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
ALAN/ALAN D wrote: ↑Mon Jan 01, 2024 10:40 am
Happy New Year Gents.
Not got round toooo this yet.
Is there any links to join. ???
Is it just click / pay
Sorry to be the bearer of bad news. It is closed, has been for a while. Keep an eye out for further Ripple projects maybe?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit