Swan_Valley wrote: ↑Thu Jan 20, 2022 6:38 pm
Checked our Ripple dashboard and they have updated the return figure for the 1st year. (about 9.5p/kWh of estimated generation).
It is now more than our annual electric bill + gas standing charge (we are trying to not use any gas).
Our average rate on Go Faster, for all imported electric, is less than 6p/kWh, compared to the return of over 9p/kWh for estimated generation from WT1.
Not a bad return & a very pleasant surprise.
Snap, life's a b1tch ain't it.
Gaz is £300 in credit and my bill is now almost fixed at £10 a month as I now only use gas for some cooking.
Leccy is £500 in credit and like you say the bill is soon to go seriously negative.
My Solar PV FITs this year will be around £3,300 a year with 13 more years to run, so some of this years FIT income will be recycled into WT2 for diversity, redundancy and that little bit of extra power.
And yet some people still call this stuff "the green crap".
Horses to water etc. The masses don't easily move.
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
Joeboy wrote: ↑Tue Dec 21, 2021 3:25 pm
Also eager to find out more on WT2 in Jan 22. I am lined up and ready to rock.
Anyone heard anything?
Nothing yet. I think it will be announced on back of WT1 energising 1st week March?
15kW PV SE, VI, HM, EN
42kWh LFPO4 storage
73kWh V2H EV
7kW ASHP
200ltr HWT.
3G
Deep insulation, air leak ct'd home
WBSx2
Low energy bulbs
Veg patches & fruit
I suspect its going to be aligned with the big switch on for max publicity and also after the April OFGEM price cap increase announcement. It was in early Feb last year.
18.7kW PV > 110MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 33MWh generated
7 Other RE Coop's
105kWh EV storage
90kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 530 m3
Excuse my french, but I fudgging hope not, sooner rather than later as stated before there is a big pile on, I anticipate there will be a big pile on regardless, they seem to be changing goalposts without telling folk the only updates are from within Camelot it seems, January is coming to an end that was meant to be the kick off point for WT2 as I recall.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
TCA wrote: ↑Sun Jan 23, 2022 6:29 pm
I asked the question a couple of weeks ago before I paid the reservation for WT2 and was told the end of January for the new share offer document.
Yup, thanks for confirming.
Welcome by the way!
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
nowty wrote: ↑Sun Jan 23, 2022 7:28 pm
The current published operational date for WT2 is Dec 2023 so don't get too excited, its going to be a long wait, potentially even longer than WT1.
It's not the initial crank date Nowty, its the buy in, I want to get started so it has momentum, statements of intent maintained & hopefully therefore showing as immediately a decent prospect when they go to the media for saturation if that time-point looks like the plan
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more