Even more offshore Scotland

Wind turbines
Post Reply
GarethC
Posts: 209
Joined: Mon May 31, 2021 8:32 pm

Even more offshore Scotland

#1

Post by GarethC »

Another few GW of capacity have been awarded through a clearing process which commenced after the Scotwind auctions.

I -think- that brings the total auctioned capacity to about 28GW. Staggering numbers.

With the Westminster administered auctions included, what's the total funnel of planned UK offshore wind capacity now?

https://www.crownestatescotland.com/new ... -announced
dan_b
Posts: 2302
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Even more offshore Scotland

#2

Post by dan_b »

That's a lot of permitted offshore wind! They'll definitely need to get moving with the Eastern Bootstrap HVDCs to shunt that power around without constraint - plans for 2x 2GW HVDC lines to move power from Scotland down into England. Not sure where they've got to.
Last edited by dan_b on Mon Aug 22, 2022 1:57 pm, edited 1 time in total.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Mart
Posts: 1314
Joined: Mon Jun 14, 2021 1:17 pm

Re: Even more offshore Scotland

#3

Post by Mart »

Can anyone answer this question. Are the Scottish seabed lease auctions additional RE deployment, or are they 'just' options for seabed lease, on which a company can then assess costs and submit a bid under the UK CfD mechanism?

In other words, are these separate deployments, or is the Scottish lease 'just' a stage along the route to a CfD contract?
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Post Reply