Shetland wind farm and connector up and running.

Wind turbines
Post Reply
User avatar
nowty
Posts: 5748
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Shetland wind farm and connector up and running.

#2

Post by nowty »

16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Post Reply