Not sure what this means - any experts out there?
https://renews.biz/79608/uk-government- ... d-storage/
UK Govt considering "Cap and floor" for pumped hydro
UK Govt considering "Cap and floor" for pumped hydro
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: UK Govt considering "Cap and floor" for pumped hydro
This definitely isn’t a surprise Dan.There are a few phs projects more or less ready to go in scotland but SSE / SP etc won’t build them in current market.
Basically strategic infrastructure like this doesn’t get built unless government creates clear long term incentives. (Same with nukes, wind, etc - more or less any kit with high up front costs and low operating costs.)
... or government could just build the infrastructure itself, as it did for all the existing Phs. But that’s a taboo subject in energy circles.
Basically strategic infrastructure like this doesn’t get built unless government creates clear long term incentives. (Same with nukes, wind, etc - more or less any kit with high up front costs and low operating costs.)
... or government could just build the infrastructure itself, as it did for all the existing Phs. But that’s a taboo subject in energy circles.
...........................
11kW Evoco wind turbine
Woodstoves
Small Firewood business
A little bit of solar thermal
11kW Evoco wind turbine
Woodstoves
Small Firewood business
A little bit of solar thermal
Re: UK Govt considering "Cap and floor" for pumped hydro
I see CEGB.........
Moxi
Moxi