Coire Glas progress?

Water turbines and anything associated
Post Reply
User avatar
nowty
Posts: 5137
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Coire Glas progress?

#2

Post by nowty »

1.5GW output and 30GWh capacity giving 20 hours running duration, approved to go, £1.5 billion cost, ready in 8 years.

I just looked at some of my grid storage investments for comparable costs. A recent 2hr duration 40MW project costs circa £20 million. So 1.5GW might cost half as much but would only run for 2 hours.

10 times the storage for twice the cost seems a good deal to me.
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
Mart
Posts: 1013
Joined: Mon Jun 14, 2021 1:17 pm

Re: Coire Glas progress?

#3

Post by Mart »

Worth comparing to Dinorwig which has slightly more power with 6 300MW turbines, v's the 5 x 300MW here, but at 9.1GWh is less than a third of the planned energy at Coire Glas. A truly huge scheme, and good timing I think too.
3.58kWp ESE PV + 2.0kWp WNW PV.
Two BEV's.
Two small A2A heatpumps.
AE-NMidlands
Posts: 1815
Joined: Wed Jun 02, 2021 6:10 pm

Re: Coire Glas progress?

#4

Post by AE-NMidlands »

The BBC radio report this morning emphasised that it still depends on how the government is going to rig the finances. The Beeb webpage report says
Scotland's only other pumped storage scheme, operated by Drax Group, is housed within a giant artificial cavern inside Ben Cruachan on the shores of Loch Awe in Argyll. The North Yorkshire-based company plans to more than double the generating capacity of its facility, nicknamed Hollow Mountain, to more than 1GW, with the construction of a new underground power station.
But both Drax and SSE have been reluctant to press ahead without assurances from Whitehall.
"SSE needs clarity around how the UK government is going to support projects like Coire Glas," Mr McCutcheon explained.
"It was a key element of their energy security strategy last year, but we need to see how that's going to work in practice."
He added: "It doesn't require subsidy but they are enormous investments."
Specifically, SSE would like a commitment to a revenue stabilisation mechanism and more assurances about how the regulated energy market would reward low carbon power generation.

Prof Bell of Strathclyde University said answers were urgently needed by industry, pointing out that the Climate Change Committee, which advises the UK and devolved governments, had published a report this month asking ministers for greater clarity.
There is at least 1 more biggie in Scotland and a small 1 in Wales - so all are in limbo because of our (climate) zombie government's inaction.
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
smegal
Posts: 249
Joined: Fri Apr 08, 2022 7:51 pm

Re: Coire Glas progress?

#5

Post by smegal »

AE-NMidlands wrote: Tue Mar 21, 2023 3:47 pm The BBC radio report this morning emphasised that it still depends on how the government is going to rig the finances. The Beeb webpage report says
Scotland's only other pumped storage scheme, operated by Drax Group, is housed within a giant artificial cavern inside Ben Cruachan on the shores of Loch Awe in Argyll. The North Yorkshire-based company plans to more than double the generating capacity of its facility, nicknamed Hollow Mountain, to more than 1GW, with the construction of a new underground power station.
But both Drax and SSE have been reluctant to press ahead without assurances from Whitehall.
"SSE needs clarity around how the UK government is going to support projects like Coire Glas," Mr McCutcheon explained.
"It was a key element of their energy security strategy last year, but we need to see how that's going to work in practice."
He added: "It doesn't require subsidy but they are enormous investments."
Specifically, SSE would like a commitment to a revenue stabilisation mechanism and more assurances about how the regulated energy market would reward low carbon power generation.

Prof Bell of Strathclyde University said answers were urgently needed by industry, pointing out that the Climate Change Committee, which advises the UK and devolved governments, had published a report this month asking ministers for greater clarity.
There is at least 1 more biggie in Scotland and a small 1 in Wales - so all are in limbo because of our (climate) zombie government's inaction.
Hopefully this happens too.

https://www.buccleuch.com/landmark-inve ... -galloway/
dan_b
Posts: 1860
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Coire Glas progress?

#6

Post by dan_b »

This is excellent news for sure - progress has been painfully slow but if it heralds the start of new investment in (pumped) hydro that's all good.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
AE-NMidlands
Posts: 1815
Joined: Wed Jun 02, 2021 6:10 pm

Re: Coire Glas progress?

#7

Post by AE-NMidlands »

dan_b wrote: Sat Mar 25, 2023 4:17 pm This is excellent news for sure - progress has been painfully slow but if it heralds the start of new investment in (pumped) hydro that's all good.
my fear is that none of these will actually go ahead due to the network/grid rules. Don't forget
But both Drax and SSE have been reluctant to press ahead without assurances from Whitehall.
"SSE needs clarity around how the UK government is going to support projects like Coire Glas," Mr McCutcheon explained.
The only thing I can see which side-steps the problem is storage co-located with generation. Pumped storage is predominantly balanced in-out so paying grid fees in both directions makes it a non-starter.
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
dan_b
Posts: 1860
Joined: Tue Jun 15, 2021 10:16 am
Location: SW London

Re: Coire Glas progress?

#8

Post by dan_b »

True - the network access/payment rules are still a major stumbling block
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
User avatar
nowty
Posts: 5137
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Coire Glas progress?

#9

Post by nowty »

AE-NMidlands wrote: Sat Mar 25, 2023 5:00 pm The only thing I can see which side-steps the problem is storage co-located with generation. Pumped storage is predominantly balanced in-out so paying grid fees in both directions makes it a non-starter.
This should be obvious but its the first time I've suddenly realised the issue. :oops:
Makes it more difficult for pumped storage to compete with battery co-located with wind generation.
15.2kW PV > 100MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 19MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 490 m3
CrofterMannie
Posts: 97
Joined: Sun Jun 13, 2021 5:29 pm

Re: Coire Glas progress?

#10

Post by CrofterMannie »

I have wondered if the proposed loch Kemp PSH scheme (not far from coire Glas) is to get round this. It is very close to Corriegarth (which iirc is about 150MW) and could probably have their own private convection to the windfarm, eliminating grid charges.
8kw solar
ETA log boiler
5ha woodland
MG5EV
Post Reply