By converting an existing hydro scheme into a pumped storage one
https://renews.biz/99820/sse-files-plan ... ro-scheme/
SSE applies to create new 100MW pumped hydro
SSE applies to create new 100MW pumped hydro
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: SSE applies to create new 100MW pumped hydro
Fascinating, and true LDES at up to 160hrs.
I've got a passion for upgrading hydro to PHS, but never sure how viable it is. Typically it means building a catchment lagoon at the release point, and also having to maintain min/max river flows ..... but if I'm understanding this scheme correctly, none of that applies, as it discharges into a Loch.
So simply able to pump up, or discharge as much/little as they want, have I got that right(ish)?
I've got a passion for upgrading hydro to PHS, but never sure how viable it is. Typically it means building a catchment lagoon at the release point, and also having to maintain min/max river flows ..... but if I'm understanding this scheme correctly, none of that applies, as it discharges into a Loch.
So simply able to pump up, or discharge as much/little as they want, have I got that right(ish)?
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: SSE applies to create new 100MW pumped hydro
Thanks, good news.
Has SSE finally committed to Coire Glas yet - it always seems to be next year.
Has SSE finally committed to Coire Glas yet - it always seems to be next year.
Re: SSE applies to create new 100MW pumped hydro
Mart,
Presumably the original turbines could not pump and thats why they need to fit a new turbine ? Otherwise perhaps it is as simple as you imply.
Ken
Presumably the original turbines could not pump and thats why they need to fit a new turbine ? Otherwise perhaps it is as simple as you imply.
Ken
Re: SSE applies to create new 100MW pumped hydro
Thanks, but oops, I meant to also say that turbines may need to be upgraded/replaced as necessary, but was just thinking about the large civils works that may not be needed.
I suppose this applies well to PHS projects that utilise sea water too, but (again assuming) those projects probably need to be built out fully, as they won't already exist?
I seem to recall that Norway and Sweden have huge potential for PHS, by 'simply' adding catchment lagoons (and upgrading turbines) to existing hydro facilities. But it may be simpler for them to expand wind and solar, and use the hydro as a form of large scale storage, by dialling down generation at times when other RE is doing well.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Re: SSE applies to create new 100MW pumped hydro
They've been doing some exploratory digging/tunnelling to properly assess the geology, but not sure what the latest is from that