Stockport hydro newsletter extract

Water turbines and anything associated
Post Reply
AE-NMidlands
Posts: 2024
Joined: Wed Jun 02, 2021 6:10 pm

Stockport hydro newsletter extract

#1

Post by AE-NMidlands »

Though I would post this here because of its wider implications.
A storm in January and a record high river brought down a huge amount of gravel and created a gravel bar which inhibits water reaching the turbines. Fortunately we still do have some water flow and we are literally ticking over on single screw operation, despite there being no meaningful rain since February.
The gravel floods have brought down has effectively lifted the bed of the river below the turbines by about twenty-five centimetres, much reducing the head over the weir. (The greater the water drop – head - the more energy is created, and vice versa.) This needs to be tackled by dredging and here the Environment Agency is causing us serious problems; a nightmare of mismanaged red tape and bureaucracy. The Permit to Dredge they have issued us is not fit for the purposes we need and impractical to operate. We are in the process of appeal; not easy. They are stone-walling to cover a whole history of maladministration. This particular episode has been going on for well over a year so we missed last summer’s window to dredge, and at a cost. The indication is that last financial year was £5,000 below budget and we are facing escalating dredging costs.

Reading between the lines of two long reports the EA produced in their full-of-nonsense response, totalling seventy pages, they want to close us down by attrition and use us as a template for leverage to shut down other Hydro operations in line with the aims of Association of European Anglers who detest hydros. The Inspector who will arbitrate over our appeal for common sense has set up an on-line public meeting mid-June. More details asking for your support will follow.
It makes me wonder how on earth a small group with a vested interest can make a government agency act in a way which is so obviously against the real objectives of that agency...
I suppose I shouldn't be surprised as the powers that be managed to stop a hydro at Teddington lock and weir.
2.0 kW/4.62 MWh pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWh batt
30 solar thermal tubes, 2MWh pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
Mr Gus
Posts: 3813
Joined: Sun Jun 13, 2021 9:42 pm
Location: Tofu eaters paradise (harrumph)

Re: Stockport hydro newsletter extract

#2

Post by Mr Gus »

Words fail me, thanks for posting this insight.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more