Action begins at 2 minutes in.
Lilium test flight 28/09/23
Re: Lilium test flight 28/09/23
Electric fans and VTOL?
Clever.
Clever.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: Lilium test flight 28/09/23
Shows a bit more detail of the electric engines.
https://lilium.com/jet
https://lilium.com/jet
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3