Second system extension extension.
Re: Second system extension extension.
Just in from an early evening beer and bronzie, a stunning day. Powers out of it now here (sub 1,050W incoming) yet had a 41+kWh day off of the home systems. Nicely balances the waning output of Graig Fatha as the season changes.
Also had an 82 mile run today with SWMBO in the I5 to collect some furniture. Almost all miles are now back in the tank and purely from the Sun, epic. Really epic.
Also had an 82 mile run today with SWMBO in the I5 to collect some furniture. Almost all miles are now back in the tank and purely from the Sun, epic. Really epic.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Second system extension extension.
41 kWh , is that a PB ?Joeboy wrote: ↑Thu May 19, 2022 7:23 pm Just in from an early evening beer and bronzie, a stunning day. Powers out of it now here (sub 1,050W incoming) yet had a 41+kWh day off of the home systems. Nicely balances the waning output of Graig Fatha as the season changes.
Also had an 82 mile run today with SWMBO in the I5 to collect some furniture. Almost all miles are now back in the tank and purely from the Sun, epic. Really epic.
Nowty Towers has been struggling to keep up with visitors using more hot water and several return trips to London in the EV but still near 100% solar.
Today was a 60 kWh solar day and needed it to charge the EV back from London yesterday. Almost 20 kWh added to home battery and 33 kWh added to the EV today.
And all WT1 going into the VB.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Second system extension extension.
Yep, a PB, peaked at 6.6kW incoming. . You're doing quite well too! I echo what you said last month, amazing how much power can be absorbed by the EV's. Even more amazing that we then waft about on sunshine. Away for a 100 mile run today, no grid touch required. Alsonowty wrote: ↑Fri May 20, 2022 12:10 am41 kWh , is that a PB ?Joeboy wrote: ↑Thu May 19, 2022 7:23 pm Just in from an early evening beer and bronzie, a stunning day. Powers out of it now here (sub 1,050W incoming) yet had a 41+kWh day off of the home systems. Nicely balances the waning output of Graig Fatha as the season changes.
Also had an 82 mile run today with SWMBO in the I5 to collect some furniture. Almost all miles are now back in the tank and purely from the Sun, epic. Really epic.
Nowty Towers has been struggling to keep up with visitors using more hot water and several return trips to London in the EV but still near 100% solar.
Today was a 60 kWh solar day and needed it to charge the EV back from London yesterday. Almost 20 kWh added to home battery and 33 kWh added to the EV today.
And all WT1 going into the VB.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Second system extension extension.
Well Nowty, a new PB.
4.5kW from the solaredge and 3.19kW from the Victron. Round it up to 7.7kW.
These values were momentary peaks, more typical for sustained time periods are below.
3.19kW has never been seen on the Victron as it was finished at the closing of the season last year. I hope for one cold clear day before the weather heats up just to see what it can do.
4.5kW from the solaredge and 3.19kW from the Victron. Round it up to 7.7kW.
These values were momentary peaks, more typical for sustained time periods are below.
3.19kW has never been seen on the Victron as it was finished at the closing of the season last year. I hope for one cold clear day before the weather heats up just to see what it can do.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Second system extension extension.
cant beat a good 10kw on a Saturday morning
- Attachments
-
- snapshot.png (27.71 KiB) Viewed 1604 times
Re: Second system extension extension.
Phenomenal! 0.8kW here at the moment.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Second system extension extension.
How much kWp do you have to achieve that mostie?That is some serious oomph!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Second system extension extension.
i'm at my parents house, my dad still lives here, 10Kw installed in 2011 with 3 inverters, I bought 8 410w panels last november and installed them on the spare bit of west roof, well 6 of 8, roof needs repaired.
I'm eyeing up the garage roof maybe another 9 455w panels and a load of storage
I'm eyeing up the garage roof maybe another 9 455w panels and a load of storage
Re: Second system extension extension.
Aye, that'll get it done in all scenarios! 17+kWp.MoSTiE wrote: ↑Sat May 28, 2022 12:34 pm i'm at my parents house, my dad still lives here, 10Kw installed in 2011 with 3 inverters, I bought 8 410w panels last november and installed them on the spare bit of west roof, well 6 of 8, roof needs repaired.
I'm eyeing up the garage roof maybe another 9 455w panels and a load of storage
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Second system extension extension.
I have one further possibility of system extension in the realms of normal(ish). Wondering at a fifth string feeding into the Victron charge controller. Could place this string up on the top roof of the loft conversion where it would be fit and forget. Can connect it into the existing string of three on the roof already with branch connectors.
As this would be my most defo last set of panels(honest guv) I am wondering if there is much much room for movement in the panel voltage on a set of three? I'd like to stretch the panel size as much as possible in this last set.
Does anyone know if the voltage envelope can be pushed and by how much?
I am currently four strings of three,
325W
OC 40.87v
MP 33.97v
For example, can I slip this panel in as a string of three?
https://www.itstechnologies.shop/collec ... olar-panel
As this would be my most defo last set of panels(honest guv) I am wondering if there is much much room for movement in the panel voltage on a set of three? I'd like to stretch the panel size as much as possible in this last set.
Does anyone know if the voltage envelope can be pushed and by how much?
I am currently four strings of three,
325W
OC 40.87v
MP 33.97v
For example, can I slip this panel in as a string of three?
https://www.itstechnologies.shop/collec ... olar-panel
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees