Cable trouble
Cable trouble
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Cable trouble
Yep, posted here in the "UK HVDC Interconnectors" thread yesterday
https://camelot-forum.co.uk/phpBB3/view ... t=20#p2294
But good extra info about the length of the outage - at least it looks like they'll be able to get it back up and running on half-capacity fairly soon.
https://camelot-forum.co.uk/phpBB3/view ... t=20#p2294
But good extra info about the length of the outage - at least it looks like they'll be able to get it back up and running on half-capacity fairly soon.
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work