I ended up doing a bit of tweaking to my auto saving session setup yesterday as it was the first time I got to test it live.
It's got quite complex now.
It checks every half hour to see if their is the possibility of a saving session as issued at about 10am. It then checks for the confirmation in the afternoon that their will be a saving session, then a bit later to see which companies have had bids accepted and informs me via Alexa of if I need to opt in.
When the time comes, after I've confirmed to opting in, it then turns things on and off when required.
It's got quite complex now.
It checks every half hour to see if their is the possibility of a saving session as issued at about 10am. It then checks for the confirmation in the afternoon that their will be a saving session, then a bit later to see which companies have had bids accepted and informs me via Alexa of if I need to opt in.
When the time comes, after I've confirmed to opting in, it then turns things on and off when required.
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Octopus saving sessions coming 1st Nov
Tinbum, how much harder is it to do an auto "opt in", surely thats the only thing left.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Octopus saving sessions coming 1st Nov
Not sure on that one, don't know if that's possible, still learning. Edit- I'll have to see where the button links to next time.
It took me ages yesterday to find a way of getting the dates out of the CSV files for checking who was opted in. I could get the company names fine but it only ever seemed to use the last date in the file!! SWMBO was getting fed up of all the Alexa announcements as I was adjusting things!!
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Octopus saving sessions coming 1st Nov
Heads Up !,
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. DFS Tests are scheduled for tomorrow Thursday 16/02/2023 This is an indication that DFS Service Requirements might be published today at 14:30 for Providers being tested. Tests will be System Tagged. For full details see the ESO Data Portal at https://data.nationalgrideso.com/dfs/de ... test-event. Notification Issued at 10:21 hours on 15/02/2023. Issued by Peter Chandler National Grid Electricity National Control Centre.
I wonder if its going to be an early one this time,
From: Power System Manager - National Grid Electricity Control Centre NATIONAL GRID NOTIFICATION - DEMAND FLEXIBILTY SERVICE. DFS Tests are scheduled for tomorrow Thursday 16/02/2023 This is an indication that DFS Service Requirements might be published today at 14:30 for Providers being tested. Tests will be System Tagged. For full details see the ESO Data Portal at https://data.nationalgrideso.com/dfs/de ... test-event. Notification Issued at 10:21 hours on 15/02/2023. Issued by Peter Chandler National Grid Electricity National Control Centre.
I wonder if its going to be an early one this time,
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Octopus saving sessions coming 1st Nov
Not too early I hope as we have a scheduled power interruption tomorrow morning!
3.87kWp PV
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
10.24kWp PV SolarEdge system
Tesla Powerwall 2
100 x 47mm Navitron tubes (still being installed!) Now likely to be removed for more PV.
MK2 PV router DHW diverter
Morso 5kW WBS
Vaillant AroTherm 10kW ASHP
Nissan Leaf
Re: Octopus saving sessions coming 1st Nov
It's on. 17.00 to 18.00
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Octopus saving sessions coming 1st Nov
Not so sure,
"A DFS Service Requirement has been published for tomorrow. This is for an onboarding test for a subset of providers. Please view the service requirement file in this dataset for details of the required volumes and times. This will be System Tagged."
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Octopus saving sessions coming 1st Nov
Damm- will have to put a search term like "subset" in my flow to filter.nowty wrote: ↑Wed Feb 15, 2023 2:46 pmNot so sure,
"A DFS Service Requirement has been published for tomorrow. This is for an onboarding test for a subset of providers. Please view the service requirement file in this dataset for details of the required volumes and times. This will be System Tagged."
Edit Octopus not in their, it's BG, EquiwattLimited,SoloEnergyLimited and Utilita.
Last edited by Tinbum on Wed Feb 15, 2023 4:35 pm, edited 1 time in total.
85no 58mm solar thermal tubes, 28.5Kw PV, 3x Sunny Island 5048, 2795 Ah (135kWh) (c20) Rolls batteries 48v, 8kWh Growatt storage, 22 x US3000C Pylontech, Sofar ME3000's, Brosley wood burner and 250lt DHW
Re: Octopus saving sessions coming 1st Nov
Saving session results are in, extra column added to show kWh saved as well.
10x 405W JA Solar panels (4.05kWp) @ 5 degrees
3x 405W Longi panels (1.22kWp) @ 90 degrees
16.5kWh DIY LifePo4 battery
Solis inverter/charger
0.6kW Ripple WT
64kWh Kia E-Niro
3x 405W Longi panels (1.22kWp) @ 90 degrees
16.5kWh DIY LifePo4 battery
Solis inverter/charger
0.6kW Ripple WT
64kWh Kia E-Niro
Re: Octopus saving sessions coming 1st Nov
Oops, whilst checking, I accidently (seriously) pressed the redeem button on my phone, its turned into fabulous February.
Virtual Battery (VB) is now over 100% SOC which is enough to run Nowty Towers for at least a year.
Virtual Battery (VB) is now over 100% SOC which is enough to run Nowty Towers for at least a year.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3