Part ownership of a Ripple Wind Turbine, fancy it?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
There is just something magical about a windfarm build that a solar farm build cannot compete with. The shear size of components being delivered to site plus the crazy cranes you need to build them.
Whereas the solar farm is something all of us could do, given enough time, its just Nowty Towers x 3500.
I've just noticed GF has returned the first £1k of my just over £5k investment in less than 14 months operation.
Octopus Virtual Battery SOC now at 123% and rising.
Whereas the solar farm is something all of us could do, given enough time, its just Nowty Towers x 3500.
I've just noticed GF has returned the first £1k of my just over £5k investment in less than 14 months operation.
Octopus Virtual Battery SOC now at 123% and rising.
Last edited by nowty on Wed May 10, 2023 9:46 pm, edited 2 times in total.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I used to walk the length of turbine blades at dock in Freidrickshaven Denmark on nightshift. Truly awe-inspiring bits of kit, the shape is awesome. Twinkling under the sodium arcs covered in dew, pretty cool.
Just checked and I have it as 19.26% roi to date since first turn of the blades.
Today looks like a decent day at site.
Further checking (I'm doing this on my phone so might not be bang on), by the end of year 2 assuming close matched performance to year 1 we will see a total roi across the two years of 50%.
Just checked and I have it as 19.26% roi to date since first turn of the blades.
Today looks like a decent day at site.
Further checking (I'm doing this on my phone so might not be bang on), by the end of year 2 assuming close matched performance to year 1 we will see a total roi across the two years of 50%.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Just heard I've got one free ticket for fully charged North courtesy of Ripple. Will make a long weekend of it me n swmbo in the Bongo!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Online tracking for the KH towers and blades which are on their way to Ayr from their port in Turkey.
https://www.vesselfinder.com/vessels/details/9849136
Online tracking for the KH nacelles and hubs which are on their way to Ayr from their port in Germany.
https://www.vesselfinder.com/vessels/details/9528524
They will be housed at the port in Ayr until they are delivered to site in early July.
https://www.vesselfinder.com/vessels/details/9849136
Online tracking for the KH nacelles and hubs which are on their way to Ayr from their port in Germany.
https://www.vesselfinder.com/vessels/details/9528524
They will be housed at the port in Ayr until they are delivered to site in early July.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Did I read on this thread that there was a way of investing in the first 2 projects or was I dreaming that
Mitsubishi Ecodan
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
ASHP 8.5kW x 2
12 x 460w Solar panels
9.5kWh GivEnergy
Batteries x 2
EVs x 4 210 kWh Batteries
Ripple 5.8 kW PV 0.547 kW Whitelaw Brae
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Only if someone withdraws and no other members of the CoOp wants to buy more shares.
Considering the waiting list for KH (existing members) one month ago was over 1,300 persons waiting, you don't need to do the maths to work out its not happening.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I wonder when they will start discussing / planning project four and will it be another solar farm, wind farm or will they go hydro ?
Moxi
Moxi
Re: Part ownership of a Ripple Wind Turbine, fancy it?
They have said the reservation list for P4 will open when the P3 (DW) offer closes. They have also said they will launch P4 this year but it comes down to how quick DW closes. I don't believe it will close mid this month and may well be extended for several more months.
As to whether its Solar / Wind / Hydro, who knows, it will depend what "ready to go" projects there are to choose from. The biggest difficulty seems to be finding a project with a reasonable grid connection timetable.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Thanks Nowty,
I'm not partaking of DW but another WT or Hydro system would be taken up as I now consume more because of the BEV.......oh and the fact that the kids are getting older and therefore more electrical gadgets for them and cooking and cleaning blah blah blah you get the idea, we are getting to the point where we will need a significant boost to our power generation.
Moxi
I'm not partaking of DW but another WT or Hydro system would be taken up as I now consume more because of the BEV.......oh and the fact that the kids are getting older and therefore more electrical gadgets for them and cooking and cleaning blah blah blah you get the idea, we are getting to the point where we will need a significant boost to our power generation.
Moxi
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Hydro would be nice so we can be happy in the rain as well and the sun and wind.
Although I'm now full at somewhere around 200%, it was 120% of my use but I've just become too efficient at using energy.
Damn those Dubai bulbs.
Although I'm now full at somewhere around 200%, it was 120% of my use but I've just become too efficient at using energy.
Damn those Dubai bulbs.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 26MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3