Ah, truly I remember the angst of GF delays! I got into looking well down the road and going OHMMMMM, no joke. Now we are down the road and it's . Soon enough for all we KH'ers.Mr Gus wrote: ↑Wed Jun 07, 2023 8:18 pm Timeline (which I moaned for ages that it was lacking, which eventually got updated with more anticipated project milestones)...
October 2023
Grid connection communication works
December 2023
Connection protection works
Early 2024
Energisation and final commissioning of turbines
However, I think I remember seeing something somewhere that said earlier than 2024 for commissioning, unless I was completely mistaken.
Part ownership of a Ripple Wind Turbine, fancy it?
Re: Part ownership of a Ripple Wind Turbine, fancy it?
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Ripple have said they cannot commission without the grid connection.
Everything else looks ok, all foundations done, all turbine components delivered and stored at the port in Ayr. Roadworks enroute to site done and dry run completed with simulated load. So, finish off site roads, crane standing areas, deliver to site and assemble.
Everything else looks ok, all foundations done, all turbine components delivered and stored at the port in Ayr. Roadworks enroute to site done and dry run completed with simulated load. So, finish off site roads, crane standing areas, deliver to site and assemble.
Last edited by nowty on Wed Jun 07, 2023 8:48 pm, edited 1 time in total.
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
That's why i've kept some distance from the ripple thread for a few months, but last 2days found myself wanting a bit of info joe.
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Ok, would I be right in thinking that it was cited as april 2024 & now the timeline is reflecting that adjustment announcement? ..is that where i'm confused / confusing?
1906 ripplewatts @wind Turb-ine-erry
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
It's the wifes Tesla 3 (she lets me wash it)
Leaf 24
Celotex type insulation stuffed most places
Skip diver to the gentry
Austroflamm WBS
A finger of solar + shed full more
Re: Part ownership of a Ripple Wind Turbine, fancy it?
OK, let's play. KH 3rd March 24. Generating for us.
Anyone?
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
I will take the 5th of April
Moxi
Moxi
Re: Part ownership of a Ripple Wind Turbine, fancy it?
1st May.
16.9kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Ripple 6.6kW Wind + 4.5kW PV > 25MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
Re: Part ownership of a Ripple Wind Turbine, fancy it?
The switch on guesstimate list has started! A wee bit to do yet
Those S5 base sections!
https://fb.watch/l1d-pz7Lw5/
Those S5 base sections!
https://fb.watch/l1d-pz7Lw5/
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
The timeline completion date has been early 24 for months? Although I could easily have missed a bit of news?
Luckily by that time of year that's all low level indoor.work as it will be blowing a hoolie there!
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Re: Part ownership of a Ripple Wind Turbine, fancy it?
Hardware beginning to go in.
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees