The prototype Vestas 15MW machine generated 363MWh in 24hours. That's a LOT of energy from one turbine.
https://renews.biz/87514/vestas-turbine ... ld-record/
Big wind
Re: Big wind
That's a capacity factor of 101%, over that day.
Round of applause.
Round of applause.
8.7kWp PV [2.12kWp SSW + 4.61kWp ESE PV + 2.0kWp WNW PV]
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.
Two BEV's.
Two small A2A heatpumps.
20kWh Battery storage.