I can't remember which thread this was being discussed in before, but looks like this will be announced in the budget today, and then presumably Sizewell C will get the nod, closely followed by something at the site at Wylfa
https://www.bbc.co.uk/news/business-59051025
New funding scheme for new nuclear
New funding scheme for new nuclear
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work
Re: New funding scheme for new nuclear
There was a similar story in the FT saying costs would be "Front Loaded" to bill payers.
18.7kW PV > 109MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
Ripple 6.6kW Wind + 4.5kW PV > 27MWh generated
6 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 520 m3
Re: New funding scheme for new nuclear
The Bill to enable regulated asset base funding for new nuclear builds had its second reading in Parliament and passed on a majority of 275. Looks like Sizewell C and probably Wylfa Newydd might be back on the agenda. Maybe Bradewell B too?
https://www.eadt.co.uk/news/nuclear-bil ... ll-8465986
https://www.eadt.co.uk/news/nuclear-bil ... ll-8465986
Tesla Model 3 Performance
Oversees an 11kWp solar array at work
Oversees an 11kWp solar array at work