Part ownership of a Ripple Wind Turbine, fancy it?

Wind turbines
User avatar
Joeboy
Posts: 7784
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3411

Post by Joeboy »

nowty wrote: Sun Jan 21, 2024 4:31 pm
Joeboy wrote: Sun Jan 21, 2024 4:17 pm Rain has arrived here and wind is picking up. Looks like GF site will be worth watching 21.00hrs onwards.
Especially the blade angle. :twisted:

How high will it go to prevent overspeed ? :?
Not sure but that's the learning curve this evening. I've not been up close to a wind turbine running at full chat in a big blow. It must be mighty impressive especially on the 2MW and up sizes. :twisted:
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5573
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3412

Post by nowty »

At 20:30, 40 mph, 17.2 degree blade angle and 96+ % CF. :twisted:
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 7784
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3413

Post by Joeboy »

nowty wrote: Sun Jan 21, 2024 8:57 pm At 20:30, 40 mph, 17.2 degree blade angle and 96+ % CF. :twisted:
Gotta love it when a previously undulating prediction flattens off in our favour. :D

Looking forward to seeing how tomorrow plays out. If only KH was being test run... :oO:

Image

Image
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5573
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3414

Post by nowty »

Prestwick airport is currently 35 to 51 mph, in other words the virtual Kirk Hill wind farm is maxed out. :xx:

If only it was plugged in. :cat-tear:
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 7784
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3415

Post by Joeboy »

BBC news 21.31

Gusts up to 90mph recorded so far
We've just got through an updated list of the strongest gusts recorded in the UK today. They are:

Capel Curig, Wales: 90mph
Loftus, North Yorkshire: 76mph
Killowen, Northern Ireland: 76mph
Mumbles, Wales, 75mph
Emley Moor, West Yorkshire, 75mph
North Wyke, Devon, 74mph

Yoicks! :shock:
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
User avatar
nowty
Posts: 5573
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3416

Post by nowty »

I bet Moxi is getting a kicking. :?
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 7784
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3417

Post by Joeboy »

nowty wrote: Sun Jan 21, 2024 9:56 pm I bet Moxi is getting a kicking. :?
Aye, from his mil? :D

I hope all is 👍.(sorry Moxi).
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
AE-NMidlands
Posts: 1954
Joined: Wed Jun 02, 2021 6:10 pm

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3418

Post by AE-NMidlands »

Joeboy wrote: Sun Jan 21, 2024 9:26 pm At 20:30, 40 mph, 17.2 degree blade angle and 96+ % CF. :twisted:
shut down now:
Screenshot 2024-01-21 at 22-56-25 Members - Insights.png
Screenshot 2024-01-21 at 22-56-25 Members - Insights.png (79.24 KiB) Viewed 1335 times
2.0 kW/4.62 MWhr pa in Ripples, 4.5 kWp W-facing pv, 9.5 kWhr batt
30 solar thermal tubes, 2MWhr pa in Stockport, plus Congleton and Kinlochbervie Hydros,
Most travel by bike, walking or bus/train. Veg, fruit - and Bees!
User avatar
nowty
Posts: 5573
Joined: Mon May 31, 2021 2:36 pm
Location: South Coast

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3419

Post by nowty »

Only temporary, its going again at 23:50, 44mph, 20.3 degree blade angle and 95% CF. :twisted:
16.9kW PV > 107MWh generated
Ripple 6.6kW Wind + 4.5kW PV > 22MWh generated
5 Other RE Coop's
105kWh EV storage
60kWh Home battery storage
40kWh Thermal storage
GSHP + A2A HP's
Rain water use > 510 m3
User avatar
Joeboy
Posts: 7784
Joined: Mon May 31, 2021 4:22 pm
Location: Inverurie

Re: Part ownership of a Ripple Wind Turbine, fancy it?

#3420

Post by Joeboy »

nowty wrote: Mon Jan 22, 2024 12:08 am Only temporary, its going again at 23:50, 44mph, 20.3 degree blade angle and 95% CF. :twisted:

Image
19.7kW PV SE, VI, HM, EN & DW
Ripple 7kW WT & Gen to date 19MWh
42kWh LFPO4 storage
95kWh Heater storage
12kWh 210ltr HWT.
73kWh HI5
Deep insulation, air leak ct'd home
Zoned GCH & Hive 2
WBSx2
Low energy bulbs
Veg patches & fruit trees
Post Reply